Topic | Recent |
---|---|
Letter Templates Not TransferringCI-2009 MRc4: Recycled Contentposted by Patrick Moore on Aug 3, 2010, 7:54 pm
Has anyone had issues with information you enter on the Recycled Content letter templates not automatically populating on... Last reply: Erica Godun, Aug 9, 2010, 3:52 pm |
|
CS 2009 SSc8: Light Pollution ReductionCS-2009 SSc8: Light Pollution Reductionposted by Viann Lau on Aug 9, 2010, 6:55 am
For interior lighting of CS 2009 SSc8, does it include covered carparking areas? If dimming of light would cause security problem, which option would be more applicable for achieving this credit... |
|
LEED Online v2.0CS-2009 IDc2: LEED Accredited Professionalposted by javier bolanos zeledon on Jul 29, 2010, 11:00 am
I'm sorry if this is to obvious question but I'm new at this. Last reply: javier bolanos zeledon, Aug 8, 2010, 9:08 pm |
|
Help with Interpretation!CI-2009 EAp3: Fundamental Refrigerant Managementposted by Dan LeBlanc on Mar 18, 2010, 12:13 pm
What is clear is that all equipment within the LEED-CI scope must be CFC-free. Whether this extends to the base-building systems is still unclear. Although the prerequisite seems to include only... Last reply: Shillpa Singh, Aug 6, 2010, 3:23 pm |
|
Lighting Power DensityCS-2009 SSc8: Light Pollution Reductionposted by Tom Fik on Aug 6, 2010, 3:22 pm
Is there maximum allowable... |
|
Building Area Method Compliance PathCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Andreas M. Roessler on Aug 6, 2010, 8:13 am
We've got a question concerning "Building Area Method Compliance Path" in the Chapter 9: "Lighting", ASHRAE Standard 90.1-2007. Appendix G: Performance Rating Method involves the Table G3.... Last reply: Dane Sanders, Aug 6, 2010, 2:02 pm |
|
Exterior WindowsCI-2009 IEQc8.1: Daylight and views - daylightposted by kelvin duen on Jul 29, 2010, 11:57 am
Our Project's exterior windows were installed prior to moving into the building. The make and model of the windows are thus unknow. What value do I use for the... Last reply: Jill Perry, PE, Aug 6, 2010, 1:10 pm |
|
EQ Credit 8.1 Prescriptive Method for Top LightingNC-2009 IEQc8.1: Daylight and views - daylightposted by Kendal Neitzke on Aug 6, 2010, 10:16 am
I am working through the prescriptive calculations for daylighting for a 64,312 sq ft open floor manufacturing facility where the exposed roof deck is 41'-6" above the finished floor. This one... Last reply: Eddy Santosa, Aug 6, 2010, 11:30 am |
|
Using different metrics (volume and weight) for MR: Solid WasteEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Andrew Barnes on Aug 6, 2010, 9:03 am
In LEED EB:O&M, MR credits 7-9, measurment and documentation of on-going consumable, durable goods, etc. is required during the performance period. My understanding is that this is to be... Last reply: Dan Ackerstein, Aug 6, 2010, 11:12 am |
|
kitchen facilities and LEED rating system selectionGeneral forumsposted by Tristan Roberts on Aug 5, 2010, 8:43 pm
Interesting question. If this were only about selecting a LEED rating system, I would say that it falls under LEED for New Construction, not LEED for Homes, due to the lack of kitchen facilities... Last reply: Larry Jones, Aug 6, 2010, 9:12 am |