CS-2009 IEQc8.2: Daylight and views - views
posted by BH . on Apr 29, 2011, 9:21 am

Hi,

I would like to confirm if in point 3 of exemplary performance mean that within a distance of 3 x 42`` (typically) there will be no obstacles like glass walls, furnitures ect. between...

Last reply: Jill Perry, PE, Jun 28, 2011, 11:42 am

Split Site Recycling

NC-2009 MRc2: Construction Waste Management
posted by Jon Texter on Jun 13, 2011, 12:07 pm

We are working on a 10 building apartment complex, which consists of 9 Residential Buildings and a Community Building. The Community building is attempting LEED NC Silver, but the Residential...

Last reply: RETIRED, Jun 28, 2011, 11:36 am

Basis of Design (BOD)

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Peter Doo on Jun 28, 2011, 9:06 am

Lately, engineers have been submitting their specifications as the Basis of Design document. We haven't submitted any for review yet but this has occurred several times by different engineers. Is...

Last reply: Scott Bowman, Jun 28, 2011, 10:02 am

Complying with "Reasonable LEED Boundary" and excluding irrigati

Schools-2009 WEc1: Water Efficient Landscaping
posted by Sylvia Schwartz on Jun 10, 2011, 2:03 pm

I am having difficulty interpreting the paragraph in this credit describing how to deal with athletic fields. It seems to me that it would be acceptable to draw the LEED boundary including...

Last reply: Tristan Roberts, Jun 28, 2011, 7:31 am

IEQ3.2 IAQ MANAGEMENT PLAN- OPTION 2

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Jérôme Aruanno on Jun 8, 2011, 10:43 am

Hi,

I am questioning about the second option, mesuring the contaminant levels.

The table p 462 is indicating level to respect. but in front of each specific contaminant, there is...

Last reply: Tristan Roberts, Jun 28, 2011, 6:17 am

Regularly Occupied Spaces

CS-2009 IEQc8.2: Daylight and views - views
posted by Daniela Aguilera on Jun 27, 2011, 12:26 pm

Hi, i'm working on a core and shell proyect particularly in 8.2 credit,and i have the next question about it, are cafeteria and file room a regularly occuped spaces??, and another question is ,...

Last reply: Susann Geithner, Jun 27, 2011, 4:46 pm

Average time expenditure for LEED Project Administration

LEED Rating System Selection
posted by KC Kurtz on Jun 26, 2011, 1:24 pm

All --

I work for a small Design-Build company in Durham, NC and we are looking to certify our new office building (12,000 sq. ft adaptive...

Last reply: David Posada, Jun 27, 2011, 3:03 pm

Process loads different between proposed & baseline designs

NC-2009 EAc1: Optimize Energy Performance
posted by Santiago Rodriguez on Jun 27, 2011, 11:40 am

For a major renovation of a restaurant they have made a major substitution of old kitchen appliances to new, more efficient equipment. Can this be included into the energy modeling of the...

Last reply: Susann Geithner, Jun 27, 2011, 2:38 pm

Layout for retail spaces

CS-2009 IEQc8.2: Daylight and views - views
posted by Rubén M. R. on Jun 9, 2011, 2:55 pm

Hi,
I am working on a C&S building, it will be mainly occupied by offices and we have a proposed layout for those spaces. The ground floor is for retail,
do we need to prepare a...

Last reply: Susann Geithner, Jun 27, 2011, 2:21 pm

Climate zone outside the USA

NC-2009 EAp2: Minimum Energy Performance
posted by Xing Shi on Jun 25, 2011, 1:49 am

We just finished the design submittals of 2 projects in Jiangsu, China. Does ASHRAE set climate zone in China. In one review comment, review team suggested that we should choose Zone 3, however,...