Log in
Forum
Topic

MR c3.2 Materials Reuse- Furniture & furniture

CI-2009 MRc3.2: Materials reuse - furniture and furnishings
posted by Pamela Branch on Dec 1, 2011, 9:15 pm

My client is a small non-profit, and on a shoe string budget. They are using used or donated furniture for 100% of their Furniture/Furnishings. I'm having trouble with the table indicating that...

Last reply: Pamela Branch, Dec 2, 2011, 11:53 pm

LEED for District Cooling Plant

LEED Rating System Selection
posted by Banafsheh Shobeiri on Oct 6, 2011, 4:01 am

We are working on a DCP with associated parking space and a minor office space. Is LEED NC appropriate for this utility building? If so, is there a minimum floor area requirement for the offices...

Last reply: Karen Joslin, Dec 2, 2011, 8:30 pm

Part II AGMBC timeline

LEED Guidance for Campuses and Multiple Buildings
posted by Melissa Merryweather on Nov 4, 2011, 12:45 am

Glad to finally get the partial update to Part II. Frustrated to see that the on-line advice on fees still relates to Part I, nothing on Part II yet.
Is there any advice on whether this...

Last reply: Melissa Merryweather, Dec 2, 2011, 7:04 pm

waste auditing timeline

EBOM-2009 MRc6: Solid waste management - waste stream audit
posted by Rachael McClain on Mar 31, 2010, 2:15 pm

Hi, I was wondering about the timeline. The reference guide reccomends performing the waste audit early in the performance period so improvements can be made over most of ther performance period...

Last reply: Barry Giles, Dec 2, 2011, 4:59 pm

Naturally Ventilated Corridors

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Matthew Macko on Nov 30, 2011, 3:53 pm

Do corridors need to have access to operable windows within 25 feet?

Last reply: Dylan Connelly, Dec 2, 2011, 2:56 pm

Exterior Lighting Trespass for Campus Project

NC-2009 SSc8: Light Pollution Reduction
posted by Omer Moltay on Dec 2, 2011, 2:09 pm

We are working on a mixed use development where we have to achieve this credit for two buildings (with facade lighting) on a master site, but the buildings are only 16 m. apart from each other....

ASHRAE 90.1- Mandatory Provision 10.4

CI-2009 EAp2: Minimum Energy Performance
posted by Ricardo Sobral on Dec 2, 2011, 8:21 am

If EPAct 1992 does not reference 50Hz electrical motors, these don't need to comply with 10.4 minimum efficiencies?
Thanks in advance.

Last reply: Marcus Sheffer, Dec 2, 2011, 11:09 am

LEED plaques not included for v2 projects

General forums
posted by Tristan Roberts on Nov 13, 2011, 9:36 pm

Brian, thanks for noting this. Here is the rest of the GBCI...

Last reply: Angie Plantz, Dec 2, 2011, 10:58 am

IEQp1 compliance for high-rise with 1 outdoor air intake

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Dawn Brenner on Apr 27, 2011, 2:06 pm

The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007. The building has only one...

Last reply: David Hubka, Dec 2, 2011, 10:08 am

LEED NC 2.2 – Sunset Date

LEED Rating System Selection
posted by Bryan Waters on Dec 1, 2011, 10:29 am

We have a project registered under LEED NC 2.2- After completion of Construction Documents of Phase 1; the project went on hold over a year ago. No submittals have been made to...

Last reply: Susan Walter, Dec 2, 2011, 9:08 am