emergency exterior lighting

NC-2009 SSc8: Light Pollution Reduction
posted by Iris Amdur on Dec 15, 2011, 2:58 pm

Are there any circumstances where emergency exterior lighting would be exempt from credit requirements?

Definition of Site Area?

NC-2009 SSc5.2: Site development - maximize open space
posted by Ellen Mitchell on Apr 11, 2011, 4:06 pm

This may be a dumb question, but I have a project that falls under Case 3 - provide vegetated open space equal to 20% of the project's site area. I can't find any credit language that says...

Last reply: Manny Iglesia, Dec 15, 2011, 2:08 pm

Reflecting Pool

NC-2009 SSc5.2: Site development - maximize open space
posted by Rosana Correa on May 9, 2011, 2:08 pm

Hello everyone!

Will areas covered with reflecting pools count as open space areas?

Thanks!

Last reply: Manny Iglesia, Dec 15, 2011, 1:56 pm

Commercial Kitchen hand washing sinks

CI-2009 WEc1: Water Use Reduction
posted by ANDREW MOISEEV on Dec 15, 2011, 11:56 am

Are the hand wash sinks included in the 20% reduction requirement?

Last reply: Seema Pandya, Dec 15, 2011, 12:05 pm

VOC Limit Table- LEEDuser and Reference Guide

CS-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Rand Ekman on Feb 7, 2010, 1:48 pm

I'm wondering whether the...

Last reply: Reid Middlebrooks, Dec 15, 2011, 11:20 am

Spec Sections vs. LEED Credits checklist?

General forums
posted by John Ida on Dec 14, 2011, 3:32 pm

http://www.masterspec.com/users/specifying_leed_requirements.php

ARCOM offers some sort of checklist or...

Last reply: Susan Walter, Dec 15, 2011, 9:39 am

lighting and plug loads separate?

CS-2009 EAc5.2: Measurement and verification - tenant submetering
posted by Markus Henning on Oct 4, 2011, 9:54 am

I am working on a LEED-CS 2009 project. We will reach Credit EA 5.2 Measurement and Verification – Tenant...

Last reply: BH ., Dec 15, 2011, 6:06 am

Option 1: Without tenant, does not meet pre-requisite.

CS-2009 EAp2: Minimum Energy Performance
posted by Whitney Dorn on Dec 13, 2011, 2:36 pm

The client is developing without a tenant and is deferring major HVAC components to the tenant build-out (air handlers.) Without air handlers, the energy model does not meet pre-requisite with...

Last reply: Marcus Sheffer, Dec 14, 2011, 2:16 pm

EQp2 (ETS control)- use of air curtain

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Meike Borchers on Dec 14, 2011, 1:02 pm

Does anyone know if air curtains have been allowed by USGBC to prevent tobacco smoke entering a building? Our client would like to utilise an air curtain between the smoking area on an external...

Last reply: Tristan Roberts, Dec 14, 2011, 1:08 pm

Can we use LEED-NC?

LEED Rating System Selection
posted by Wei Jiang on Dec 14, 2011, 3:15 am

We are working on a resort project compring several multi-story buildings and a dozen of villas. The villas are stand-alone buildings with one or two stories. Because these villas are commercial/...