I am working on a LEED-CS 2009 project. We will reach Credit EA 5.2 Measurement and Verification – Tenant Submetering. The measurement and verification plan provide the following meters for the rental unit. - Water meter - Heat meter (space heating) - Cold meter (space cooling) - Electricity meter (lighting and plug loads) only one meter for both All these meters will be monitored via BMS. My Question is: must we measure the electricity use for lighting and plug loads separate? Or is it sufficient to measure these values together? And repot them to the BMS for evaluation of the tenant and fulfill the requirements of Eac5.2.