High Efficiency Chiller Refrigerant Charge vs. CapacityNC-2009 EAc4: Enhanced Refrigerant Managementposted by James Keohane on Oct 14, 2011, 5:05 pm
It seems to me that an unintended consequence of selecting a high efficiency water cooled centrifugal chiller ( both R-123 and R-134a) is the greater difficulty keeping impact per ton below 100... Last reply: James Keohane, Feb 19, 2012, 2:00 pm |
|
GWP / ODP of Water & Lithium BromideNC-2009 EAc4: Enhanced Refrigerant Managementposted by Jens Apel on Jan 27, 2012, 3:30 am
In our project a absorption chiller will be used to cover part of the cooling load. The chiller will run on lithium bromide / water solution. In this case, water is the refrigerant. Last reply: Nadav Malin, Feb 19, 2012, 8:52 am |
|
Performance Period ClarificationPerformance Periodposted by Michelle Bracewell-Musson on Feb 13, 2012, 12:38 pm
I have read quite a bit about the Performance Period and I want to be sure I am understanding things correctly. Basically, if the project meets the Energy Star minimum of 69 today (I haven't... Last reply: Dan Ackerstein, Feb 18, 2012, 8:24 pm |
|
Min OA rate of a VAV syts with DCVNC-2009 IEQp1: Minimum indoor air quality performanceposted by Chellapillai Srinivasan on Feb 7, 2012, 6:53 am
How do one determine minimum outdoor air intake flow of a... Last reply: Roger Chang, Feb 18, 2012, 8:06 am |
|
SF6 in MV switchgears- Any LEED limits?NC-2009 EAc4: Enhanced Refrigerant Managementposted by Werner Sobek on Feb 4, 2011, 6:49 am
Does the SF6 (Sulphur Hexafluoride) insulating gas used to quench the arc in electrical power equipment (MV switchgears) need to be taken into consideration under the EAc4? The credit language... Last reply: Tristan Roberts, Feb 18, 2012, 12:28 am |
|
Blower door test formNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Stefania Minotti on Nov 22, 2011, 5:31 pm
Hi, does anyone know where I can find the ‘’Certificate of Field Verification and Diagnostic Testing’’ that needs to be filled out for each blower door test that is performed, as indicated in ‘’... Last reply: Tristan Roberts, Feb 17, 2012, 10:27 pm |
|
Electric CigarettesNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Andreas M. Roessler on Jan 31, 2012, 12:58 pm
Dear all, one of our major clients set an interesting question concerning electronic cigarettes. In the building - we already certified - smoking is not allowed, but could be electronic... Last reply: Tristan Roberts, Feb 17, 2012, 10:20 pm |
|
Site contaminationSchools-2009 SSp2: Environmental Site Assessmentposted by Carol Vick on Feb 17, 2012, 4:15 pm
I have a LEED for Schools project where we have site contamination from an old gas station leaky storage tank. We have the ESA II report and are applying to the state for assistance in a program... Last reply: Larry Sims, Feb 17, 2012, 10:17 pm |
|
Integral color and LEED concrete tracking formNC-2009 MRc4: Recycled Contentposted by Wendelyn Bone on Jan 18, 2012, 2:55 pm
I have documentation from the project's concrete supplier that includes integral color together with cementitious materials. In this case, integral color contributes significantly towards both... Last reply: Tristan Roberts, Feb 17, 2012, 9:57 pm |
|
Innovation- Double Transit RidershipNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Alicia Freire on Feb 17, 2012, 6:40 am
My understanding was that the only way to achieve this credit was to develop a Comprehensive Transportation Management Plan; however, the form also shows the following option: Last reply: Tristan Roberts, Feb 17, 2012, 9:30 pm |