Topic | Recent |
---|---|
How to Model Proposed and Baseline HVAC system for a District level heating and Cooling systemNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm
Hi, I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a... Last reply: Tyler Thumma, Nov 8, 2024, 8:36 am |
|
Baseline and Proposed System for LEED ID+CNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Nov 4, 2024, 12:00 pm
Hi I am working on a LEED ID+C project for a building that was built in 1970s with 60% WWR, now the struggle here is the Existing system is Dual Duct... Last reply: Tyler Thumma, Nov 8, 2024, 8:24 am |
|
Errors in v4.1 MEPC Excel SheetNC-v4.1 EAp2: Minimum Energy Performanceposted by Junaid Mujahid on Oct 28, 2024, 2:22 am
What is the best way to resolve errors with the v4.1 MEPC? The "Quality Assurance Checks" tab is reporting values which are inconsistent with the "Performance Outputs" tab due to which other... Last reply: Tyler Thumma, Nov 8, 2024, 8:18 am |
|
Regarding the results of the DES Large-scale calculatorRetail-CI-v4 EAc2: Optimize Energy Performanceposted by on Nov 7, 2024, 9:45 pm
Dear all, I understand that “Optimize energy performance” in LEED v4 updated in 2024 is awarded as the sum points for energy use or energy cost emissions and greenhouse gas emissions.... |
|
Additional i-Tree Tools and SupportPilot-Credits SSpc158: Onsite Carbon Sequestration Through Plantingsposted by Kristi Ennis on Nov 7, 2024, 3:17 pm
After documenting this credit, we discovered that i-Tree offers additional support, calculators and design tools on thier website which are bypassed if you use the web address listed in the pilot... |
|
Light trespass to a "welcoming neighbor"NC-v4 SSc6: Light Pollution Reductionposted by John Mlade on Nov 7, 2024, 10:08 am
Hi all, hoping you can provide some insight into this scenario. We are redeveloping a heavy industry site in an urban setting into a logistics warehouse building. Our... Last reply: Dave Hubka, Nov 7, 2024, 1:46 pm |
|
Design Changes After a Credit is "Approved"LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Deborah Lucking on Aug 17, 2016, 11:40 am
Hi all, Last reply: Emily Purcell, Nov 7, 2024, 11:33 am |
|
Cistern in only one building in campus master site- points only for that building?NC-v4 SSc4: Rainwater managementposted by Douglas Webber on Mar 25, 2022, 10:53 am
I'm working on a complex mixed-use Campus project, where we'd like to pursue this credit for 1 of the separate buildings. Only one of the buildings on the master site will have a cistern... Last reply: Erica Downs, Nov 6, 2024, 4:52 pm |
|
SS c3- Open Space | Can I count the adjacent area when it has not yet been developed?CS-v4.1 SSc3: Open spaceposted by Gry Haxholm on Nov 6, 2024, 4:47 am
Hi everyone. I am making a pre-assessment for a building that will be a part of a new neighborhood which will be a transformation of an old industrial area. It will be the first asset to be... |
|
Manufacturer Documentation- a myth?Healthcare-v4.1 MRc6: PBT Source Reduction - Lead, Cadmium, and Copperposted by Rachel Steffen on Nov 5, 2024, 9:53 am
Has anyone had any success on this credit? We cannot seem to locate any manufacturers that provide testing information on the lead in their wires. We have found a manufacturer that has a LEED... |