Topic | Recent |
---|---|
Building Reuse Option 3 on Shell buildings-- LEED C/S v4- new guidance on interiors and finishCS-v4 MRc1: Building life-cycle impact reductionposted by Landry Watson on Oct 12, 2023, 2:21 pm
We are getting some comments from the reviewer that indicate 1) We must include surfaces of interior non-structural walls in our calcs (this is new from other versions guidance) and 2) that we... |
|
Regarding Cooling Tower Water UseCS-v4 WEc3: Cooling tower water useposted by Nagaraj Sankar on Oct 11, 2023, 12:29 am
Hi, In our LEED V4 BD+C Core and Shell project for a 12-story office building, we modeled a water-cooled chiller in the base case (As per ASHRAE 90.1 - System 8). However, in the... Last reply: Dave Hubka, Oct 12, 2023, 8:53 am |
|
Bicycle facilitiesNC-v4 LTc6: Bicycle facilitiesposted by Tatevik Markosyan on Oct 11, 2023, 10:35 am
Our project is situated in Athens, Greece, where the neighborhood lacks a dedicated ... Last reply: Paula Melton, Oct 11, 2023, 3:23 pm |
|
IAQ-Flushing (Door & Window Open)NC-v4.1 EQc4: Indoor air quality assessmentposted by Girish Visvanathan on Oct 11, 2023, 3:41 am
Hi all, is it acceptable to perform flush-out with door and windows open for a period of time, rather than using mechanical equipment's (exhaust/ HVAC system)? |
|
Sourcing of Raw Materials- Materials Reuse in a Historic BuildingNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Ruth Kurz on Oct 10, 2023, 9:58 pm
Hi all, we are in the process of completely renovating a historic office tower with the aim of achieving a LEED CS Gold certification. We intend to pursue 6 points for MRc1: Building life-cycle... |
|
Prescriptive Compliance- Documentation?CI-v4.1 EAp2: Minimum Energy Performanceposted by Edgar Arevalo on Oct 3, 2023, 3:00 pm
So how should one pursue the prescriptive method for this prerequisite? In the sample form, it says to provide documentation demonstrating compliance with ASHRAE 90.1-2016, Sections 5 though 9... Last reply: Marcus Sheffer, Oct 10, 2023, 10:36 am |
|
Distribution of spaces and occupancy definition in a Core and Shell projectCS-v4 EQp1: Minimum indoor air quality performanceposted by Ricardo Sá on Feb 27, 2023, 5:38 am
Dear All, I have a question regarding LEED v4 BD+C Core and Shell, EQ P1 Minimum Indoor Air Quality Performance and EQ C1 Enhanced Indoor Air Quality Strategies. In... Last reply: Caterina Panteghini, Oct 10, 2023, 10:33 am |
|
Calculated "annual nonportable water supply" for Commerical ID+C projectCI-v4 WEc1: Indoor water use reductionposted by Thanh Nguyen on Oct 10, 2023, 2:45 am
Hi, My project is located on a LEED certificated building. The building uses rain water to supply for irrigation and toilet flushing. How can I calculate the annual non-potable water... |
|
Water Budget AnalysisNC-v4 IPc1: Integrative processposted by Subhashkumar A on Oct 10, 2023, 1:48 am
Hi all, I need clarification regarding process water in our project. Our project is entirely unconditioned space, and there is no water needed for our process. We have a diesel generator... Last reply: Subhashkumar A, Oct 10, 2023, 7:31 am |
|
Occupant's surveyPilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Dulce Solis on Oct 9, 2023, 2:34 pm
My team would like to know if you would consider taking an approach in the occupant's survey where we keep track of their current health state. This way, it alerts us when certain occupants are... |