Topic | Recent |
---|---|
Innovation: PBT source reduction- lead, cadmium and copperNC-v4 INc1: Innovationposted by David Dixon on Oct 27, 2017, 11:57 am
the credit does not allow for lead in roofing or flashing. almost all steel is recycled and the companies report minor lead in the material due to the recycled materials - the one we are... Last reply: Ann Busker, Dec 4, 2023, 10:23 am |
|
Healthcare-v4.1 MRc6: PBT Source Reduction- Lead, Cadmium, and CopperHealthcare-v4.1 INc1: Innovationposted by Ann Busker on Feb 10, 2022, 12:38 pm
Good morning, I am looking for examples to send my Plumbing and Electrcial Subcontractors to explain thier process for copper pipe joints and recycling the electrical wires containing... Last reply: Ann Busker, Dec 4, 2023, 9:50 am |
|
How can a warehouse extension project (with no regularly occupied space) comply with EQp1?Warehouses-NC-v4 EQp1: Minimum indoor air quality performanceposted by Blake Jackson on Dec 1, 2023, 2:33 pm
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the... Last reply: Dave Hubka, Dec 4, 2023, 9:26 am |
|
Increased Ventilation 15% and 30%- does it count as 2 strategies?CI-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Lidia Johansen on Dec 2, 2023, 7:36 am
Hello If we achieve increased ventilation by 30% - does it count as 2 strategies (15% and 30%)? Thanks Lidia |
|
LEED certification for open spacesLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Sergio Acevedo on Dec 1, 2023, 3:34 pm
We would like our expansion project to be LEED certified. There will be no physical separation between the existing building and the extension (no walls). In fact, the space will be... |
|
Does adding "green, pool and EV's" to parking onsite, yet outside our LEED Boundary, comply with these credits' intent?Warehouses-NC-v4 LTc8: Green vehiclesposted by Blake Jackson on Dec 1, 2023, 2:50 pm
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the... |
|
Commissioning AuthorityCI-v4 EAp1: Fundamental commissioning and verificationposted by padma priya on Dec 1, 2023, 1:46 am
Commissioning Authority - Please clarify this query. Should... |
|
Infiltration rate @ 75 Pa (ASHRAE 2016) vs. 4 Pa / 50 Pa (Design Builder Software)NC-v4.1 EAc2: Optimize Energy Performanceposted by Ziad Zeitoun on Nov 28, 2023, 11:18 am
Hello, ASHRAE 2016 specifies the... Last reply: Marcus Sheffer, Dec 1, 2023, 9:44 am |
|
Bicycle-credit doubtsNC-v4 LTc6: Bicycle facilitiesposted by Deva venkat on Nov 14, 2023, 5:40 am
Hi team, i have doubts in bicycle credit.my project location is Bangladesh government using common road for two wheeler and four wheelers. Here how i get points in bicycle credit. Last reply: Shijie Wang, Nov 30, 2023, 12:10 pm |
|
NSF/ANSI 140 Carpet- Platinum corticateNC-v4.1 EQc2: Low-emitting materialsposted by Osman Faroq on Nov 13, 2023, 3:25 am
Dears, is NSF/ANSI 140 Carpet - Platinum certificate approved and considered in Low Emitting Credit? I've looked at the certification and there is no reference to CDPH standards. ... Last reply: Patty Karapinar, Nov 29, 2023, 3:52 pm |