Topic | Recent |
---|---|
No Furniture in project scopeCI-2009 MRc4: Recycled Contentposted by Marie Mihalik on Feb 15, 2011, 3:04 pm
Can this credit, or MRc5, be attempted without CSI Division 12 Materials Cost or Furniture items included? The Furniture was not in the Architect's or the Contractor's scope of work. Last reply: Tristan Roberts, Feb 15, 2011, 3:08 pm |
|
Pursuing both Option 1 & 2?NC-2009 WEc2: Innovative Wastewater Technologiesposted by Nelina Loiselle on Oct 28, 2010, 10:58 am
Does anyone know if it is possible to pursue both option 1 & 2? I am working on a project that is treating 100% of it's waste water on site via a spetic tank and leech field AND is also using... Last reply: sara frye, Feb 15, 2011, 2:52 pm |
|
A building within college campus with shared parkingNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Eri Spaulding on Feb 15, 2011, 10:01 am
My project is located within a college campus. The building does not have its own parking within the LEED boundary. However, there is a campus parking lot adjacent to the builidng. - Can... Last reply: Michelle Halle Stern, Feb 15, 2011, 11:21 am |
|
Driver's Toilets in a Core & Shell BuildingCS-2009 WEp1: Water Use Reductionposted by Maya Karkour on Feb 14, 2011, 9:08 am
Hi, We are working on a luxurious Core & Shell Residential Building. The future tenants will decide on the water fixtures for their own flats/apartments. However, there will also be... Last reply: Maya Karkour, Feb 15, 2011, 3:18 am |
|
Retrocommissioning- Systems RequirementsEBOM-2009 EAc2.1: Existing building commissioning - investigation and analysisposted by Nate Eppley on Feb 14, 2011, 4:22 pm
I am working on a cultural center performance space in San Diego with very few HVAC system components. For ventilation, there are exhaust fans that induce outdoor air into the building through... Last reply: Pierce Holstrom, Feb 14, 2011, 7:19 pm |
|
Minimum number required by local zoning regsCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Patricia Ewanski on Jan 27, 2011, 11:18 pm
I'm not so savvy with how local zoning regs are worded. I did search for my city's local zoning regs and I'm not sure if what I found is it. Anyway, does this mean that a municipality will say... Last reply: Patricia Ewanski, Feb 14, 2011, 6:04 pm |
|
"Transport demand management strategies" for a retail mallNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Maya Karkour on Jan 19, 2011, 8:52 am
Dear all, The local area requirements for parking spaces of a retail mall is around 1974 cars and there are about 1833 car spaces at the moment, thus short of 141 cars. Any ideas of... Last reply: Larry Jones, Feb 14, 2011, 3:54 pm |
|
ADA Parking spaceNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Jeremy Knoll on Jan 21, 2011, 4:18 pm
I am working on a project which includes no new parking with the exception of 1 code-required handicap parking spot. How is this counted? Does it mean we automatically have to add a carpool space... Last reply: Larry Jones, Feb 14, 2011, 3:38 pm |
|
Pilot Credits in LEED 2009 for HealthcareNC-2009 IDc1: Innovation in Designposted by Amy Balderrama on Feb 14, 2011, 2:42 pm
There is some confusion around earning Innovation Points in LEED for Healthcare with pilot credits. Per the LEED for Healthcare rating system it is only possible to earn only one point with... Last reply: Tristan Roberts, Feb 14, 2011, 3:16 pm |
|
How to calculate Process Energy for CS?CS-2009 EAp2: Minimum Energy Performanceposted by Tatjana Ernst on Feb 9, 2011, 4:27 am
Hi everyone, we have an Core & Shell-Office Building. Last reply: Marcus Sheffer, Feb 14, 2011, 8:30 am |