Hi everyone,

we have an Core & Shell-Office Building.
We are wondering how we have to calculate the process energy. According to Reference Guide Page 273 Tenant Spaces are modelled with the values from the Table G-B. If we do so we get 20% process energy cost.
Or do we have to use the 25% of the baseline building performance?
thank you very much in advance
Tatjana