Topic | Recent |
---|---|
LEED APNC-2009 IDc2: LEED Accredited Professionalposted by TEY SIUNG on Nov 21, 2011, 11:10 am
How to upload my LEED AP certificate to earn the point ? Last reply: Maria Kutelova, Nov 24, 2011, 3:51 am |
|
EAp2- Design and Buildt ContractNC-2009 EAp2: Minimum Energy Performanceposted by André Knutsson on Nov 21, 2011, 8:01 am
Consto have a Design and Buildt Contract with the project owner. The Architects contracts is a part of the contract. His role in the project is design and drawing. Building physics is managed... Last reply: André Knutsson, Nov 24, 2011, 1:20 am |
|
LEED Project Boundary- LEED NCv2.2General forumsposted by Jennifer Turchin on Nov 22, 2011, 3:48 pm
We have a hotel project that is 23 stories and was started and registered as a LEED NCv2.2 project in 2008. The design phase submittal was completed for the project and then at that time the... Last reply: Emily Catacchio, Nov 23, 2011, 11:39 pm |
|
MRc5 Metal Stud... Assembly? Reused Furniture Manftr AND Extrxn?CI-2009 MRc5: Regional Materialsposted by Simon Sue on Nov 17, 2011, 11:20 pm
In review comments recently received by our team for a LEED-CI Retail project, the following portions have confused us: 1. "Products from _____ vendor... have the same extraction and... Last reply: Emily Catacchio, Nov 23, 2011, 11:02 pm |
|
EBOM IEQp1: Dedicated OA to classroom FCU'sEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by James Doyle on Nov 23, 2011, 2:55 pm
For EBOM IEQp1 we... Last reply: Dylan Connelly, Nov 23, 2011, 7:18 pm |
|
Envelope requirements of ASHRAE 91.1-2007CI-2009 EAp2: Minimum Energy Performanceposted by Cristina Valenzuela on Apr 25, 2011, 6:26 pm
My client is doing an interior renovation of a small office at the ground floor in an existing mixed-use building. Over the office there are residential units, and below it there is an... Last reply: Marcus Sheffer, Nov 23, 2011, 6:18 pm |
|
ClarificationGeneral forumsposted by Alexa Stone on Nov 16, 2011, 2:58 pm
Hi Puteri, Last reply: Alexa Stone, Nov 23, 2011, 1:58 pm |
|
Reclaimed Wood Floor- SCAQMD or FloorScore?NC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Jeremy Knoll on Jan 19, 2011, 10:40 am
I just want to be sure that I understand correctly that any... Last reply: Catalina A, Nov 23, 2011, 1:41 pm |
|
Fenestration in BaselineNC-2009 EAc1: Optimize Energy Performanceposted by Darin Frick on Apr 12, 2010, 8:19 am
I need to verify what is meant by proportionally distributed. I originally understood the distribution to take the total fenestration for the building and then create a band of windows around... Last reply: Marcus Sheffer, Nov 23, 2011, 1:30 pm |
|
Existing shower facilities used for previous LEED certificationNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Sharlene Angeles on Nov 23, 2011, 12:38 pm
Our project site has a sufficient changing/shower facility that is existing in another building that also achieved LEED certification, including this point. If that changing facility is located... Last reply: David Posada, Nov 23, 2011, 1:20 pm |