Forum discussion

EBOM-2009 IEQp1:Minimum IAQ Performance

EBOM IEQp1: Dedicated OA to classroom FCU's

For EBOM IEQp1 we have a school using a dedicated ventilation AHU providing ventilation air to classroom FCU's. Will we meet the prerequisite by using a TAB contractor to measure the OA flow at the dedicated ventilation AHU which is ducted to about 40 FCU’s?

3

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 11/24/2011 - 00:18

Yes, you can manually measure AHUs as stated above. We have used this method on LEED EBOM projects. Is the DOAS constant volume? For variable volume systems you often have to use the minimum air flow setting.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.