Additional Source Control and Monitoring; sensor locations

NC-v4.1 EQc1: Enhanced indoor air quality strategies
posted by Chris Flint Chatto on Aug 16, 2023, 4:33 pm

Wondering what this credit requires for location of...

Downstream Implementation of Analysis Outcomes

Pilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysis
posted by Charles Boechler on Aug 16, 2023, 3:34 pm

This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance. I am curious how value engineering exercise at the construction stage has...

Seed Evaluator Tool Effectiveness?

Pilot-Credits IPpc89: Social equity within the community
posted by Charles Boechler on Aug 16, 2023, 3:20 pm

Is the Seed Evaluator the best tool for measuring social equity?

A challenge for us in addressing social equity in plan development is engagement of the existing community is often not...

Relevant Trades/Contractors at Project Planning Stage

Pilot-Credits IPpc81: Green training for contractors, trades, operators and service workers
posted by Charles Boechler on Aug 16, 2023, 3:27 pm

From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key...

How many tests per square foot?

NC-v4 EQc4: Indoor air quality assessment
posted by Samantha Lee on Jun 10, 2020, 1:43 pm

Hi all! 

I cannot find the reference point in the USGBC Reference Guide or in the standards where it states the amount of tests required per square foot for LEED version 4. Is it 1...

Last reply: Brian Salazar, Aug 16, 2023, 2:06 pm

Interior element reuse in different project

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Nadia Azzam on Aug 16, 2023, 1:33 pm

Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED). In this case, can the first project claim points under LEED's...

Minimum Survey respond reached but no score avilable

EBOM-v4.1 LTp1: Transportation Performance
posted by Michael Ling on Apr 13, 2023, 11:00 pm

Good Day ! I would like to ask if anyone experienced that before: 

I have a project requested minium 95 survey respond, however after reached the min required respond there is no update on...

Last reply: Levi Jimenez, Aug 16, 2023, 11:29 am

Are there any Sunset Dates for v4.0 (since v4.1 is now active)? 2Qs

LEED v4.1 Discussion Forum
posted by Jenni Betancourt on Mar 23, 2020, 3:06 pm

I have a very large project that will not start construction until 2022 or 2023 and it will be under construction for several years. I therefore want to be careful about sunset...

Last reply: Dave Hubka, Aug 15, 2023, 3:40 pm

Lighting Control- Recording Studio

CI-v4 EQc6: Interior lighting
posted by Edgar Arevalo on Aug 15, 2023, 2:41 pm

I have a library project that has a recording studio in the basement.  After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor.  After checking this...

Option 2. Prescriptive Compliance

CI-v4 EAp2: Minimum Energy Performance
posted by Dave Hubka on Oct 15, 2021, 10:45 am

kinda embarrassed to ask this one, but here goes...

The ref guide and credit template require the team to upload the Target Finder performance results when pursuing Option 2. Prescriptive...

Last reply: Michelle Rosenberger, Aug 15, 2023, 11:51 am