meet options 1,2 and 3- innovation in design point?

Schools-2009 SSc10: Joint Use of Facilities
posted by Nicole Cavanaugh on Oct 7, 2010, 11:28 am

I'm working on a High School project that meets all three options in SSc10. Do you think I would be eligible to apply for an Innovation and Design point as well as an exemplary point for...

Last reply: Tristan Roberts, Oct 7, 2010, 11:42 am

Sheetrock recycling

CI-2009 MRc2: Construction Waste Management
posted by Rachael Green on Jun 24, 2010, 1:49 pm

I have several projects in Texas and we are unable to get even a minimum of 50% on these two credits due to the new TCEQ (Texas Commission on Environmental Quality) rule indicating that sheetrock...

Last reply: Clint Newton, Oct 7, 2010, 9:21 am

"Total Project Budget"

General forums
posted by Dan Ackerstein on Oct 1, 2010, 10:51 am

This is one of those things that, I suspect, was carried over from the new construction-oriented rating systems without much consideration as to how it applies to...

Last reply: Ted Mendoza, Oct 6, 2010, 9:27 pm

Systems to be Commissioned for CI Project?

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by James Del Monaco on Oct 5, 2010, 11:03 am

I have a CI project which includes the following scope of work: Our project occupies 2 floors of an 8-story office building. There are two central rooftop...

Last reply: James Del Monaco, Oct 6, 2010, 11:13 am

Re: SS and MR credits for multiple contractor projects

General forums
posted by David Posada on Sep 29, 2010, 6:56 pm

Melanie,

If the projects are being submitted separately, the separate LEED boundary for each project takes priority.

Although it's tempting to delineate the responsibilities by who...

Last reply: Melanie Harris, Oct 6, 2010, 10:00 am

Are permanently open doors or windows allowed?

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Jul 8, 2010, 6:58 am

CI Project:
Retail Areas inside a mall open their doors in the morning and stand open during the working day. These shops will be conditioned and mech ventilated. Their doors will however...

Last reply: Jean Marais, Oct 6, 2010, 5:47 am

ready-mix plants

General forums
posted by Tristan Roberts on Oct 5, 2010, 9:59 pm

Depends on whaty you're looking for, but I think there's a lot of variation in ready-mix plants.
Why do you ask? Looking for something particular?

LEED IOc EMS of ISO

EBOM-2009 IOc1: Innovation in Operations
posted by Pablo Fortunato Suarez on Oct 1, 2010, 4:45 am

When referring to ISO, does this credit require a new program or just highlight an existing practice that is not covered by LEED? Somewhere along the lines of regular measurement and monitoring...

Last reply: Natalie Bodenhamer, Oct 5, 2010, 6:21 pm

Commissioning Agent

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Augusto Velazquez on Sep 19, 2010, 5:06 pm

I am looking for assistance in determining if I qualify as a...

Last reply: Jan Wei, Oct 5, 2010, 5:08 pm

Option 2 for MPR #6

General forums
posted by Seonhee Kim on Oct 5, 2010, 5:00 pm

If option 2 is selected, it asks owner to report the energy and water consumption data via Energy Star's Portfolio manager's "Import Facility Data Templates." However, this form states "You must...