Data center--IT energy sub meter calibrationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Shoko Yasuda on Feb 2, 2011, 3:37 am
Hi, I am involved in ... Last reply: Tristan Roberts, Feb 23, 2011, 9:03 pm |
|
MPR 6 and EAp2/EAc1General forumsposted by Wendy Gibson on Jan 21, 2011, 11:01 am
MPR 6 requires "whole-building" usage data. Does this include areas that we can exempt for EAp2/EAc1? We have first floor retail and restaurant tenants that are separately conditioned and metered... Last reply: Tristan Roberts, Feb 23, 2011, 8:56 pm |
|
More multiple buildings!General forumsposted by Jeremy Knoll on Feb 23, 2011, 4:08 pm
I'm working on the first project of a 10 year masterplan, each component of which is required to be LEED Silver or better. The first project, however, is the entry-plaza, which includes a retail... Last reply: Tristan Roberts, Feb 23, 2011, 8:55 pm |
|
Parking and Data center included?EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Ricardo Sobral on Feb 20, 2011, 2:46 pm
Our project includes one Data Center and a parking space. Both spaces are not regularly occupied, according to ASHRAE 62.1-2007 glossary (they are "only occupied occasionally and for short... Last reply: Tristan Roberts, Feb 23, 2011, 8:41 pm |
|
FTE to SS 3.2 LEED CI caseCI-2009 SSc3.2: Alternative transportation - bicycle storage and changing roomsposted by Paola Figueiredo, Newton Figueiredo on Feb 22, 2011, 4:58 pm
How can I proceed with the credit SS 3.2 for a LEED CI v2.0, when the Tenant... Last reply: Tristan Roberts, Feb 23, 2011, 8:34 pm |
|
Calculating a DomeNC-2009 SSc7.2: Heat island effect - roofposted by Norma Lehman on Feb 22, 2011, 10:48 pm
We have a roof that consists of a flat roof with a dome. Last reply: Tristan Roberts, Feb 23, 2011, 8:00 pm |
|
Case 2 of SSc5.2NC-2009 SSc5.2: Site development - maximize open spaceposted by Mike Phelps on Feb 15, 2011, 11:28 am
The language for this case specifies open vegetated space "adjacent" to the building. Does adjacent mean next to the building or can it be vegetated open space near to the building as well? Also... Last reply: Tristan Roberts, Feb 23, 2011, 7:29 pm |
|
portfolio manager space designationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Pablo Fortunato Suarez on Sep 2, 2010, 11:25 pm
My client's building is predominantly an office building. We have defined other space functions (cafeteria, toilets, meeting rooms, retail spaces, etc) in the Project Info forms. However, the... Last reply: Tristan Roberts, Feb 23, 2011, 6:46 pm |
|
Growth and ErosionCS-2009 IEQp1: Minimum indoor air quality performanceposted by Adriana Hansen on Feb 9, 2011, 2:43 pm
We have an HVAC system configured with ceiling plenum return. Is this plenum required to meet item (§ 5.5.1) Resistance to Mold Growth and (§ 5.5.2) Resistance to Erosion of ASHRAE 62.1? Last reply: Tristan Roberts, Feb 23, 2011, 6:35 pm |
|
Service Hot Water Efficiency Proposed vs. BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Paul Bohres on Feb 22, 2011, 5:29 pm
How do you account for the difference in service hot water efficiency from the proposed design to the baseline design if the proposed design is using electric point-of-use water heaters? Is... Last reply: David Hubka, Feb 23, 2011, 1:56 pm |