HangarGrip Adhesive

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Elizabeth Powers on Jul 11, 2011, 5:13 pm

The product in question is the Eco Hanger Grip Adhesive from MEI, described as "a construction-type paste adhesive specially designed for bonding insulation hangers to metal ducts and unfinished...

Last reply: David Posada, Jul 18, 2011, 1:23 pm

What about embedded Adhesives

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Maya Karkour on Jul 18, 2011, 10:48 am

Hello,

Assuming the building is purchasing pre-made...

Last reply: David Posada, Jul 18, 2011, 12:53 pm

ACP

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by Whit Faulconer on Jul 18, 2011, 10:34 am

Thanks Batya, and Susan hit the nail on the head. Proposing that at some point an LCA based credit could be an ACP for some of the MR Credits is tricky for many reasons. We are working to...

Who may purchase RECs?

Schools-2009 EAc6: Green Power
posted by James Keohane on Jul 17, 2011, 12:52 pm

Is acceptable for a member of the design team or construction team to purchase RECs?

May a project team purchase RECs using project contingency funds directed by Owner?

Last reply: Marcus Sheffer, Jul 18, 2011, 8:21 am

CI Project in two buildings

General forums
posted by Steve Khouw on Jul 15, 2011, 12:06 am

Need guidance, not sure whether we have to register as 1 project or 2 here. We have a project whereby the tenancy space involves 1 building of 8 floors and the adjacent building of 3 floors. It...

Last reply: Steve Khouw, Jul 17, 2011, 10:36 am

Daylighting Calculations Out Of Range

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Eesmyal Santos-Brault on Jul 14, 2011, 7:25 pm

We are working on a mixed use commercial and residential building using OPTION 2: Prescriptive Path where we calculated 0.150

Last reply: Eddy Santosa, Jul 15, 2011, 6:28 pm

Prescriptive Method: Skylights

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Kash Boodjeh on Jun 15, 2011, 12:17 pm

Hello,
We are pursuing the Prescriptive Method for this credit, using skylights. I am not sure how to answer the first two measurements requested on the LEED form (the distance between...

Last reply: Eddy Santosa, Jul 15, 2011, 6:24 pm

a mistake in the daylight formula of the available spreadsheet

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Eddy Santosa on May 24, 2011, 8:03 pm

Please be careful and aware when you use the available spreadsheet:
Daylight and Views Calculator released 11152010.xls . The spreadsheet contains a mistake in its skylight roof coverage...

Last reply: Eddy Santosa, Jul 15, 2011, 6:22 pm

Stormwater Management

EBOM-2009 SSc6: Stormwater Quantity Control
posted by Randy Walsh on Jul 15, 2011, 4:54 pm

Does installation of mechanical filter media into the storm drain help meet this requirement? (Flogard curb filter inlet)

Last reply: David Posada, Jul 15, 2011, 5:17 pm

Negative Pressure Differential Requirement

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Maya Karkour on Jun 21, 2011, 3:31 am

Dear all,

One of the credit requirements is that:
"The pressure differential with the surrounding spaces must be at least
5 Pa on average and 1 Pa at a minimum when the doors...

Last reply: Allison Beer McKenzie, Jul 15, 2011, 5:05 pm