Green Power for LEED-CI Retail

CI-2009 EAc4: Green Power
posted by Linda Davisson on Aug 22, 2011, 11:48 am

Can anyone confirm that Green Power is 2 points for LEED-CI Retail instead of 5 points for LEED-CI? That is what the LEED-CI Retail rating system indicates, but it is such a significant...

Last reply: Lana Malone, Sep 21, 2011, 4:17 pm

Who Can Execute an REC Contract with Vendor

NC-2009 EAc6: Green Power
posted by Elliot Powers on Aug 12, 2010, 1:50 am

I haven't found anywhere in the LEED-NC 2009 Ref. Guide that stated which party has to execute the...

Last reply: Marcus Sheffer, Sep 21, 2011, 2:22 pm

Cost to be Excluded in the total proj material costs for MR CR3

NC-2009 MRc3: Materials Reuse
posted by Benjie Herrera on Sep 16, 2011, 8:41 am

I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc. in our overall project materials costs when calculating...

Last reply: Patty Breech, Sep 21, 2011, 12:29 pm

Pilot Credit 44

General forums
posted by Tristan Roberts on Sep 21, 2011, 11:39 am

LEED users may also be interested in knowing about the new Pilot Credit 44: Ergonomics Strategy.
Linda, you would also post your survey information...

rating system and credit

General forums
posted by Tristan Roberts on Sep 6, 2011, 3:20 pm

Glen, please post your question to the MRc2 forum. Thanks. Log in or register to post comments ...

Last reply: Tristan Roberts, Sep 21, 2011, 11:30 am

Too much Window Area (WA)?

Schools-2009 IEQc8.1: Daylight and views - daylight
posted by Rebecca Griffith on Feb 22, 2011, 6:52 pm

Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area? I am using the prescriptive calculation and the spreadsheet from the...

Last reply: TODD REED, Sep 21, 2011, 8:51 am

ASHRAE Compliance Forms

NC-2009 EAp2: Minimum Energy Performance
posted by Linda Wan on Sep 20, 2011, 8:56 pm

This might be a silly quesiton, but when should you submit the optional ASHRAE compliance forms? If it's optional then why should anyone ever submit these forms?

Last reply: Marcus Sheffer, Sep 21, 2011, 8:47 am

Exemplary Performance

CI-2009 SSc1: Site Selection
posted by Méabh Browne on Sep 20, 2011, 12:05 pm

Apologies if this has already been addressed, but I'm confused about how this works - if my project has already got 5 points in other Paths in this credit, can I get an additional (6th) point for...

Last reply: Susann Geithner, Sep 20, 2011, 1:46 pm

Denied Credits

NC-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Sep 20, 2011, 5:19 am

Dear all,

We received the Design Final Review for our project, and a total of 7 credits were denied.

1) If we have initially provided documentation which has not been interpreted...

Last reply: Susann Geithner, Sep 20, 2011, 10:12 am

Fire Caulk

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Lu Anne Nielsen on Aug 9, 2011, 3:58 pm

Does fire caulk fall under "other...

Last reply: Mara Baum, Sep 19, 2011, 6:54 pm