FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Denied Credits

Dear all, We received the Design Final Review for our project, and a total of 7 credits were denied. 1) If we have initially provided documentation which has not been interpreted correctly by the reviewer, can we resubmit without appealing? 2) Can we tackle and re-submit these credits at Construction stage WITHOUT additional fees? 3) If there is an error with the LEED Online forms, can we resubmit the documentation/calculations for no additional costs? I have asked these queries to the GBCI, but I am wondering if anyone had previous experience with that. Thanks!

4

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 09/20/2011 - 14:12

3) If you got credits denied or they are not showing up correctly than my first step would be emailing the reviewer through LEED online. They did correct such error quickly without having to pay for an appeal. But this only works for obvious mistakes. 1) you will have to submit for an appeal review in any case, but if you are right and you should have gotten the credits then the GBCI might pay back the appeal fee. That was the case with one of our projects. 2) That I have not had yet. You might find the answer to that in the GBCI's certification policy. Good luck.

Add new comment