Topic | Recent |
---|---|
Silicone sealant for glass block installationCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Adi Negara, LEED AP BD+C on Nov 24, 2011, 9:34 pm
Dear all, Does the silicone sealant used for the glass block installation need to comply with the maximum... Last reply: Tristan Roberts, Dec 18, 2011, 12:59 am |
|
SSc3.3 Alternative Transportation- Parkign AvailabilityCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Ashley Quinn on Dec 7, 2011, 4:05 pm
We are working on a project for LEED-CI. It falls under the Case 1, Option 1 but we do not get the 5% preferred parking closest to the main entrance because the landlord has control over that... Last reply: Tristan Roberts, Dec 18, 2011, 12:52 am |
|
SSc2 Option 1 Development DesityCI-2009 SSc2: Development Density and Community Connectivityposted by Andrea Daniels on Dec 6, 2011, 8:18 am
Do all the buildings within the Density Radius have to be part of the calculation? Last reply: Tristan Roberts, Dec 18, 2011, 12:49 am |
|
Long Term CommitmentCI-2009 MRc1.1: Tenant space - long-term commitmentposted by Tiago e Silva on Sep 15, 2011, 6:44 am
I got I bit confused with the period of time which is considered to comply with the aim of this credit. At first a thought the 10 year commitment counted from the date of the LEED... Last reply: Tristan Roberts, Dec 18, 2011, 12:41 am |
|
LEED EB as a LEED Building.. not yet certified.CI-2009 SSc1: Site Selectionposted by Denise Santini on Dec 14, 2011, 11:09 am
Hi all, We are in the process of selecting a building to put an interior fit up in. The building just registered for LEED EB gold. Now, even if the project loses a couple of points it... Last reply: Tristan Roberts, Dec 18, 2011, 12:26 am |
|
Base building EBOM credits deniedCI-2009 IDc1: Innovation in Designposted by Raphael Sperry on Nov 28, 2011, 7:18 pm
I've had a pair of CIv2009 projects just denied (at first review) a couple of innovation points where the... Last reply: Tristan Roberts, Dec 17, 2011, 11:50 pm |
|
Define Movable Furnishings of IAQ TestingCI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Holly Himes on Nov 30, 2011, 2:44 pm
The Reference Guide states movable furnishing such as workstations and partitions must be in place during... Last reply: Tristan Roberts, Dec 17, 2011, 11:36 pm |
|
Indoor Carpet AdhesivesCI-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Colleen Ice on Oct 6, 2011, 3:16 pm
Just curious I am working on IEQ 4.1 and IEQ 4.3. Both give you the option to add indoor carpet adhesives. Do I put them under both categories or just 4.3? Last reply: Tristan Roberts, Dec 17, 2011, 11:35 pm |
|
Does it matter where to install occupancy sensorsCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Steve Khouw on Jun 14, 2011, 10:55 pm
To earn this credit for Strategy 3, does it matter where we locate the sensors so long as we meet the minimum 75% connected light loads, right? The obvious choices would be in non-regularly... Last reply: Tristan Roberts, Dec 17, 2011, 11:10 pm |
|
Future Contract for SSc5EBOM-2009 SSc5: Site development - protect or restore open habitatposted by Frederick Freeman on Dec 17, 2011, 4:32 pm
We are currently pursuing... Last reply: Tristan Roberts, Dec 17, 2011, 10:50 pm |