AGMBC for a Campus Wide StudyLEED Guidance for Campuses and Multiple Buildingsposted by Mei Zhu on Apr 17, 2012, 9:17 am
We are doing a study on a university campus which has had a few LEED certified projects in the past. Looking ahead, we'd like to see if there can be a guideline as to how to approach LEED... Last reply: Mei Zhu, Apr 17, 2012, 3:19 pm |
|
Option 1 Path 2NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by shaun Andriano on Feb 29, 2012, 9:17 am
Hello. We have a building looking to meet the requirements for Option 1 Path 2. In the credit language it states that the flush is to stop at the end of occupancy for that day. The operating... Last reply: Dylan Connelly, Apr 17, 2012, 12:41 pm |
|
Documenting VOC content in productsCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Petra Hajná on Sep 13, 2011, 3:05 am
Hi everybody... again. Last reply: Gabriela Hernández Castillo, Apr 17, 2012, 12:32 pm |
|
Unable to receive the Energy Star RatingEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Dorilee Torres on Feb 23, 2012, 3:59 pm
Hello, I am involved in a Medical Device facility that is pursuing LEED evaluation. It was built and operates since three years ago outside the US. It has great green features so the owner... Last reply: Dan Ackerstein, Apr 17, 2012, 11:59 am |
|
PIF4 Project Information Form 4General forumsposted by Markus Henning on Apr 17, 2012, 7:34 am
Our project’s Design Review Submittal was returned with various comments across the board (prereqs, credits and even to PI forms). The final review returned with still two open items, a... Last reply: Samantha Harrell, Apr 17, 2012, 11:10 am |
|
Natural Gas ChillerPilot-Credits EApc8: Demand responseposted by Jacqueline Bradbury on Apr 17, 2012, 9:58 am
Does a natural gas chiller qualify for the... Last reply: Samantha Harrell, Apr 17, 2012, 10:39 am |
|
Transpired Solar CollectorNC-2009 EAc2: On-Site Renewable Energyposted by Tyler Barter on Apr 17, 2012, 10:25 am
For an upcoming project we are proposing using a metal wall system that acts as a transpired solar collector to bring preheated air into the building. Preheating the air will offset energy being... Last reply: Marcus Sheffer, Apr 17, 2012, 10:33 am |
|
Rheem Hot Water HeatersCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Elizabeth Powers on Apr 16, 2012, 7:39 pm
I am trying to determine if we need to include the conventional commercial gas/electric water heater in our Energy Star documentation. This particular type of system is not listed in the ES... Last reply: Samantha Harrell, Apr 17, 2012, 10:22 am |
|
EAp2/EAc1 Renovation Vs. New constructionNC-2009 EAp2: Minimum Energy Performanceposted by Steven Beccia on Apr 16, 2012, 1:46 pm
We are modeling a classroom building. The building is 55% renovated, and 45% new construction. We are renovating the major HVAC systems, exterior envelope, and... Last reply: Marcus Sheffer, Apr 17, 2012, 9:28 am |
|
Demand Charge & 25% Procsee CostNC-2009 EAp2: Minimum Energy Performanceposted by Joey Jiao on Apr 17, 2012, 4:46 am
Hi, everyone, If there is a project with demand charge, how should we deal with the rule of 25% process cost. Last reply: Marcus Sheffer, Apr 17, 2012, 9:16 am |