Hi, everyone, If there is a project with demand charge, how should we deal with the rule of 25% process cost. Assume one building annual cost like below: total demand cost(by $/kw)=1$ total energy cost (by $/kwh) =3$ SUM = 4$ How much dollar this building need to pay for the process cost when this building comply with the 25% rule? Thank you very much for any suggestion. Joey