Topic | Recent |
---|---|
ASHRAE 90.1, table 6.8.1 and projects outside of USANC-2009 EAp2: Minimum Energy Performanceposted by Richard Land on May 25, 2012, 5:48 am
Hello, I have been asked to help a manufacturer who wants to provide equipment for a LEED project in Europe. It is an airhandling units with packaged heat pump. At the moment they do not... Last reply: Jean Marais, May 30, 2012, 11:37 am |
|
time delay for reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Tatjana Ernst on May 30, 2012, 7:33 am
Hello Everyone, we have a project under review now. The result was expected to be there at 17 Mai 2012! But now is it still open. I already send an email to the review team to ask but i... Last reply: Megan Ritchie Saffitz, May 30, 2012, 10:08 am |
|
entrance lightingCS-2009 SSc8: Light Pollution Reductionposted by Alicja Bieszyńska on May 30, 2012, 8:26 am
Can I consider entrance lighting (light fixtures above the building entrance) a safety and comfort lighting? And therefore not to include it in the calculations? |
|
Building Facade/Landscape Lighting or Exterior Site AreasCS-2009 SSc8: Light Pollution Reductionposted by Alicja Bieszyńska on May 30, 2012, 8:20 am
In the version 2.0 of the Core and Shell system, and the old version of LEED Online, the template consists of two tables for EXTERIOR LIGHTING SYSTEMS: |
|
UCSC Master SiteLEED Guidance for Campuses and Multiple Buildingsposted by James Sherman on May 1, 2012, 4:22 pm
Hi, my name is Nathan Retzlaff and I am interning with James Sherman at UC Santa Cruz where we are in the process of registering UCSC as a master site. Our campus is very big and contains many... Last reply: Simon Sue, May 30, 2012, 3:05 am |
|
LEED HC Submission PortalLEED for Healthcare forumposted by Joshua ADY on May 6, 2012, 4:22 am
We have a Hospital Project that is ready for design submission and wanted to reconfirm if LEED HC design phase submission could be made on USGBC Portal. If not, any advise on when it would be... Last reply: Susan Walter, May 29, 2012, 2:05 pm |
|
Public transportation access- SSc4.1LEED for Healthcare forumposted by Emil Andersson on May 15, 2012, 3:14 pm
Hi. My LEED-HC project is placed on a campus where it will be physically connected to the existing hospital. At the main entrance of the larger campus hospital a large bus-stop line... Last reply: Susan Walter, May 29, 2012, 2:04 pm |
|
Coefficient for pervious and gid pavers?EBOM-2009 SSc6: Stormwater Quantity Controlposted by Nell Boyle on Oct 4, 2010, 2:18 pm
I am not seeing a default coefficient for pervious concrete or grid pavers. Can you use half of the default for pavers? Last reply: Amy Rider, May 29, 2012, 12:53 pm |
|
Alternative compliance path: Core & shell 2009 EAp2CS-2009 EAp2: Minimum Energy Performanceposted by TOMAS URIBE on May 28, 2012, 11:15 am
I am working on a Core and Shell Project and I would like to use the calculator of alternative compliance path for reducing the percentage of saving needed to meet EA the prerequisite 2. The... Last reply: Marcus Sheffer, May 29, 2012, 8:47 am |
|
Fan Power in the Proposed Building Design (C&S)CS-2009 EAp2: Minimum Energy Performanceposted by TOMAS URIBE on May 25, 2012, 10:15 am
I'm working on a project pursuing LEED Core&Shell Certification and I'm not sure about the following matter: What is the correct approach when simulating fan power in the proposed case... Last reply: Marcus Sheffer, May 29, 2012, 8:46 am |