4026 search results for "zero lot line"
Topic | Recent |
---|---|
MR credits- which divisions?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by LUCY WILLIAMS on Aug 23, 2017, 5:17 pmanyone come across a better definition or a clear line between what's in and what's out? I find the "official" definition very confusing- for example why is piping included but fire... Last reply: Michelle Robinson Schwarting, Jun 30, 2021, 4:51 am |
|
What do you think?LEED v4.1 for Building Operations and Maintenanceposted by Paula Melton on Mar 28, 2018, 3:58 pmthem here (I know it is a lot) hoping someone knows the answer for a few of them, maybe. Note: I will also post on specific credit foruns as well. Questions here:... Last reply: Ricardo Filho, Feb 21, 2023, 4:44 am |
|
leedonline offline?Navigating LEED Onlineposted by Caroline O'Leary on Aug 20, 2016, 12:30 amin LEED so I easily miss a lot of changes (but I think that's true for a large portion of people that don't document as their daily job). This is a case where they really need a redirect with very... Last reply: Deborah Lucking, Aug 22, 2016, 5:37 pm |
|
Pumps: Balancing Report HPs vs DesignNC-2009 EAp2: Minimum Energy Performanceposted by Gaston Viau on May 18, 2018, 8:18 amto get this build over the Min. line. Any comments/thoughts on this? Again, super appreciated Best Gaston Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities... Last reply: Gaston Viau, Jun 20, 2018, 4:16 pm |
|
Composite Wood- CARB Phase IINC-v4 EQc2: Low-emitting materialsposted by Brad Newkirk on Jul 24, 2018, 7:49 pmand the reply was, "We are a leading test lab for adhesive manufacturers and run a lot of D2559 qualifications but I would be surprised if you find any OSB resins or plywood adhesives that are qualified... Last reply: Dawn Garcia, Aug 20, 2024, 12:24 pm |
|
"Impossible" to achieve option 2NC-v4 EQc7: Daylightposted by Sarah Leenknegt on Aug 16, 2018, 5:49 amwith specularity of all materials to be set to zero, however later we will need to change all materials to black for similar reasons (see section 4.1) so for simplicity we will change materials to black here... Last reply: Francesco Passerini, Mar 20, 2019, 5:09 am |
|
Acceptable Forms of a Tenant Lease Agreement | LEED Design Review CommentsCS-v4 EAp2: Minimum Energy Performanceposted by Eric Schlichting on Aug 22, 2018, 1:14 pmWe have a whole lot of experience with this issue. Marcus is right. You only need to provide part of the documentation but it does need to include the following: page with project designation, page... Last reply: Marelle Davey, Nov 3, 2023, 5:22 pm |
|
V4- SSc5- Heat Island Reduction- occupiable roofsCS-v4 SSc5: Heat Island Reductionposted by Thomas Gibbons on Sep 14, 2018, 10:26 amHi folks, SSc5- Heat Island Reduction Core & Shell V4 Working on an office project with occupiable roofs on floors 3 – 8. Each outdoor patio consists of green roof and pavers. The pavers are set up on a pedestal system – below the pedestal system we hold water as a blue roof – all of that sitting upon “the roof” (insulation, weather barrier, deck, etc). I’m trying to figure out what would be considered roof versus nonroof measure here in regard to the pavers. I’ve read up on a lot of the discussion on the forums though I haven’t seen something specifically addressing this in v4 (though I could... Last reply: Glen Boldt, Apr 10, 2024, 1:11 am |
|
Minimum IAQ performance monitoring requirementNC-v4 EQp1: Minimum indoor air quality performanceposted by sonali rajwade on Feb 22, 2019, 1:52 amI see, thanks a lot for the clarification. Our system is negative pressure system (cooling pad/curtain) in Cambodia. Actually we don't try to achieve the enhanced credit, but just the prerequisite.... Last reply: Dang Thi, Jun 8, 2020, 9:25 pm |
|
Inclusive Design Pilot CreditPilot-Credits INpc125: Inclusive Designposted by CodeGreen Solutions on Jun 20, 2019, 4:16 pmto the project; it's a university campus so a lot of the policies and available resources are campus wide rather than project specific and existed prior to the project development. So for example we... Last reply: Margaret Montgomery, Mar 15, 2021, 8:30 pm |