4027 search results for "zero lot line"
Topic | Recent |
---|---|
Regularly Occupied SpacesCS-2009 IEQc8.2: Daylight and views - viewsposted by Daniela Aguilera on Jun 27, 2011, 12:26 pmto post comments Daniela Aguilera Poch asociados LEEDuser Basic Member 7 thumbs up June 27, 2011- 3:52 pm Thanks Susann, i sent a "feedback" to leed on line. At the same time, i had another... Last reply: Susann Geithner, Jun 27, 2011, 4:46 pm |
|
Ink CartridgesEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Kimberlee Dobbins on Jun 27, 2011, 2:54 pmto count (by weight or volume) to your best method possible (and I would include lots of photos) and provide this to the USGBC (by filling in the form with the total amount...weight or volume...that you have... Last reply: Barry Giles, Jun 28, 2011, 3:00 pm |
|
LEED for Retail: CICI-2009 SSc2: Development Density and Community Connectivityposted by Kory Beighle on Jul 19, 2011, 4:52 pmif the number of units and it's site area meet the 10 dwelling units per acre (DUA) ratio. True, in some cities, this kind of information is easy to access on line from the city or planning department's website, but not all cities make this kind of GIS data easily accessible on line. You could try calling the planning department to see if they'll give you the information you need. To your final... Last reply: David Posada, Sep 29, 2011, 12:54 pm |
|
IDC Material and Resource Calculator (June 2011).xlsCI-2009 MRc5: Regional Materialsposted by Derek Fung on Jul 25, 2011, 4:11 amIn June 2011, a new credit template upload requirement was added, the USGBC version of the materials data spreadsheet. We're running into a problem when we try to add more rows to the spreadsheet using the ADD MATERIAL macro. I've tried it on several different computers (albeit all running Microsoft Excel 2007) and we keep getting a Run-Time Error "1004". Anyone else getting this? Alternatively, does anyone have the password to this spreadsheet so that we can add more lines manually? MRc5 ... Last reply: Mark Krejcarek, Jun 25, 2012, 12:33 pm |
|
Ready Mixed MortarCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Maya Karkour on Jul 26, 2011, 7:41 amsure the product meets the VOC standard for ceramic tile adhesive. There are many low and zero- VOC products of this type available. Anyone concerned about which category a product fits into should look... Last reply: Yetsuh Frank, Aug 15, 2012, 3:33 pm |
|
MR Credits Sections- Revamp of Recycle/Reuse/Regional/RenewableGeneral forumsposted by Jessica McNaughton on Aug 3, 2011, 1:31 amChristina Macken Assistant Project Manager, LEED v4 U.S. Green Building Council LEEDuser Premium Member 141 thumbs up August 10, 2011- 12:14 pm Hi Jessica- Thank you for pointing out a line we will need to clarify. The MR Credit for Environmentally Preferable Non-Structural Materials is worth one point total. What we mean by "credit can be obtained by each attribute met" is that each... Last reply: Keith Lindemulder, Sep 13, 2011, 6:21 pm |
|
Confirmation of Case 1 Option 2 and DocumentationCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Raymond Loo on Aug 8, 2011, 12:50 amthat no parking spots are 'provided' / available to our client in any manner, whether for additional charge or not (or in other words, the building does not even have a parking lot)? In our client's case, there is a parking lot located within the building but it is available to them at the same charge per hour as it is to anyone. Anyone, such as a tenant, guests/customers of tenants, or local area... Last reply: Tristan Roberts, Nov 21, 2011, 1:34 am |
|
Energy Modeling: Dome (Design) vs. Dome (Baseline)?NC-2009 EAc1: Optimize Energy Performanceposted by Nelina Loiselle on Aug 8, 2011, 5:14 pmlose track of what 90.1 is trying to measure. That's why 90.1 established ground rules- the line has to be drawn somewhere. In your case, you're stuck on the wrong side of that line. Log... Last reply: Christopher Schaffner, Sep 8, 2011, 10:49 am |
|
Expiring Energy Star Rating and Eligibility for LEEDEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Nelina Loiselle on Aug 11, 2011, 4:12 pmand different operating hours than rest of the building, the room can be entered as a separate space in Portfolio Manager using the Office space type. In the space details, enter the weekly operating hours, zero... Last reply: Hannah Bronfman, Oct 5, 2011, 11:26 am |
|
Daylight Controls required for task lighting?CI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Robin Bass on Aug 23, 2011, 1:25 pmLtd. LEEDuser Basic Member 304 thumbs up July 31, 2012- 11:17 am Based on the current LEED On-Line form, Option B and Option C appear to have different connected lighting loads. Option B allows... Last reply: CT G, Jul 19, 2017, 11:00 am |