4027 search results for "zero lot line"
Topic | Recent |
---|---|
Life Support Systems factored in to EAp2 or EAc1?NC-2009 EAp2: Minimum Energy Performanceposted by Lance Collins on Sep 23, 2010, 4:14 pmwithin the animal space, the recognition that vivariums are often designed for 15 air changes is not applied to the LEED model. The base LEED model would reflect 10 air changes as well, resulting in a zero... Last reply: Marcus Sheffer, Sep 24, 2010, 1:49 pm |
|
Req'd # of integrative design team (with owner) seems highPilot-Credits PC6: Integrative Project Planning & Designposted by Renee Shirey on Sep 30, 2010, 3:34 pmI am all for regularly scheduled LEED/sustainability mtgs with the team, but to have that many (12!) and require the owner to be at each of them stops them from being beneficial working mtgs and turns them into a LOT of "presentation" meetings with the owner- with not a lot getting done. I thing the owner should be required to be part of a percentage of them, but not all of them. And/or to have periodic mtgs with the client (but not all 4 members of the integrative design team) makes sense too. Working mtgs without the client allows the design team to be a bit more free in the discussion... Last reply: Tammy George, Oct 19, 2010, 1:49 pm |
|
LEED IOc EMS of ISOEBOM-2009 IOc1: Innovation in Operationsposted by Pablo Fortunato Suarez on Oct 1, 2010, 4:45 amWhen referring to ISO, does this credit require a new program or just highlight an existing practice that is not covered by LEED? Somewhere along the lines of regular measurement and monitoring of air quality, waste water quality, and occupational noise. This brings direct benefit to the users, and may be considered something that LEED does not cover in this much detail. IOc1 ... Last reply: Natalie Bodenhamer, Oct 5, 2010, 6:21 pm |
|
Coefficient for pervious and gid pavers?EBOM-2009 SSc6: Stormwater Quantity Controlposted by Nell Boyle on Oct 4, 2010, 2:18 pmfor pervious concrete? While there can be a great deal of variablility between materials in market areas, the normal range is 500- 200+ inches per hour permeability. This would seem to equate much closer to zero... Last reply: Amy Rider, May 29, 2012, 12:53 pm |
|
What plants constitute the baseline under Option 1CS-2009 WEc1: Water Efficient Landscapingposted by Deborah Lucking on Oct 6, 2010, 2:57 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up October 8, 2010- 10:51 am The baseline case is supposed to represent conventional landscaping choices for the region, according to the LEED Reference Guide.A non-native plant could be part of the baseline if it's conventionally used there in landscaping. Log in or register to post comments Gabriela Hernández Castillo Architect, LEED AP BD+C SYASA- México LEEDuser Basic Member 201 thumbs up December 21, 2010- 1:06 am We have a project that is a zero lot line and because of the shape of the building... Last reply: Tristan Roberts, Dec 21, 2010, 7:57 am |
|
Water Pressure and reductionCI-2009 WEp1: Water Use Reductionposted by Edwin Wealend on Oct 9, 2010, 2:33 amversions of LEED there were a number of CIRs about this question specifically, and the responses were consistently in line with Tristan's- the pressure listing is for consistency in calculations, you... Last reply: Carl Sherman, Dec 30, 2010, 10:06 am |
|
Recently announced RP credits for international projectsSchools-2009 RPc1: Regional Priorityposted by Bilge Ceylan on Oct 21, 2010, 6:53 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up October 21, 2010- 9:23 am Any LEED 2009 projects registered in LEED Online will have the credits automatically applied. You don't have to do anything!Where the credits have different thresholds, you only have to hit the lowest threshold. I discussed details and listed the credits in this LEEDuser post. Log in or register to post comments Bilge Ceylan Green Building/Project Management Consultant Individual Entrepreneur LEEDuser Basic Member 13 thumbs up October 21, 2010- 9:55 am Tristan, Thanks a lot... Last reply: Tristan Roberts, Oct 21, 2010, 10:19 am |
|
Claiming SSc4.3 & c4.4NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Clare Parry on Nov 1, 2010, 12:56 amMichelle Teague Architect, LEED Consultant Polk Stanley Wilcox Architects LEEDuser Basic Member 39 thumbs up November 10, 2010- 6:42 pm I am assuming there is existing parking and that you are adding a charging station to one of those spots? Then try putting in a 1 instead of a zero and explain in your narrative. Log in or register to post comments Clare Parry Senior Sustainability Consultant Umow Lai LEEDuser Basic Member 29 thumbs up November 10, 2010- 6:59 pm The 0 in the form comes from SSc4.4, and I cant alter this value. However, this value of zero is correct- the site is not provided... Last reply: Jesus Deras, Sep 23, 2013, 10:15 am |
|
Frequency of InspectionsEBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioningposted by Maria Unruh on Nov 8, 2010, 5:06 pmPierce Holstrom Director of Engineering Environmental Building Strategies LEEDuser Basic Member 69 thumbs up November 8, 2010- 5:34 pm Ben, A lot of the ongoing commissioning items typically feed into a buildings normal operating plan. Checking calibration of thermostats, confirming supply temperatures, confirming functionality of lighting controls... Are the retro- commissioning items you are referring to similar to an outside air balance or another larger maintenance service? Log in or register to post comments Maria Unruh Electrical Engineer Antella Consulting Engineers LEEDuser Basic Member 72 thumbs up... Last reply: Pierce Holstrom, Nov 8, 2010, 7:44 pm |
|
Water Use Reduction calculations- kitchen / food service sinkSchools-2009 WEc3: Water Use Reductionposted by Gendel Metlitsky on Nov 10, 2010, 9:24 amthat it depends on a lot on the project and the specifics of the sink. Sorry not to have more info. Log in or register to post comments ... Last reply: Tristan Roberts, Mar 29, 2011, 8:57 am |