Bus transfersNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Tiffany Moore on Feb 20, 2013, 2:48 pmI have a campus project with public bus service on all sides and one through the middle. A person can walk to three bus stops serving 2 public bus lines and the campus shuttle within 1/4 mile. What I'm looking for is research on whether I could also count a 4th bus stop that serves a 3rd public bus line. This stop is.27 miles from the building, but could be accessed by getting on one of the public buses at a closer stop, riding 2 blocks on campus, and then change to a public bus on the 3rd line. The rest of the "shutle" variables seem to be met, less than 2 miles, ride of 5- 10 minutes,... Last reply: Tristan Roberts, Feb 20, 2013, 10:55 pm |
|
Option 2 for site that is partially zero-irrigationEBOM-2009 WEc3: Water Efficient Landscapingposted by Lyle Axelarris on Feb 28, 2013, 6:15 pmI have set IE=0. This is the only way that I have found that I can get zero Total Water Applied (0 TWA) for those areas. Do you think that this approach (described in a narrative) will be acceptable?... Last reply: Lyle Axelarris, Jul 16, 2013, 2:03 pm |
|
Tandem SpacesCS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Michael E. Edmonds-Bauer on Apr 5, 2013, 2:36 amline." So I think we have a chance. We will probably submit it as two preferred parking spaces per company, and it will be preffered since it will be at second underground level and since enterprises... Last reply: Michael E. Edmonds-Bauer, Apr 24, 2013, 2:09 pm |
|
uploading OPR and BOD in the LEED On-LineNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Benjie Herrera on Apr 29, 2013, 7:29 amScott Bowman LEED Fellow Integrated Design + Energy Advisors, LLC LEEDuser Expert 519 thumbs up April 29, 2013- 10:45 am Typically we have uploaded all the documents required for the commissioning credits. Remember for EAp1, you do not have to upload a lot of documents, depending on which way you are showing documentation. The documentation has changed with v2009, and is more streamlined in my opinion. First, the owner will initial that they have approved the OPR. Second, the CxA will confirm that the OPR includes all the necessary items in the check boxes on the template. Third, you confirm... Last reply: Benjie Herrera, Apr 30, 2013, 7:11 pm |
|
Purchasing Wood prior to Obtaining CoC CertificateNC-2009 MRc7: Certified Woodposted by Maya Karkour on May 27, 2013, 5:46 ama lot more work and cost for that 1 pt when you are looking at the big picture for the project. Log in or register to post comments ... Last reply: Michelle Rosenberger, May 30, 2013, 3:40 pm |
|
Stair Pressurization Fans and Booster pumpsNC-2009 EAc3: Enhanced Commissioningposted by Bob Crowell on May 29, 2013, 5:05 pmthe line that way (insofar as LEED requires): hot water equipment in, domestic booster pumps, gray water, rain water collection, etc, out. Have you gotten more sweeping direction from GBCI as part of a CIR... Last reply: Peter Dishno, Jul 12, 2013, 10:56 am |
|
No-break (UPS- UPS- Uninterruptible Power Supplies)CI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Vitorio Lepiane on Jun 6, 2013, 10:19 amin LEED calcs. They can represent a LOT of wattage so best to catch them and ensure they are ENERGY STAR rated in the planning/specifications stages of a project. Thoughts? Log in or register to post... Last reply: Danna Richey, Nov 8, 2018, 2:55 pm |
|
Proposed v Baseline Outdoor airNC-2009 EAp2: Minimum Energy Performanceposted by Joseph Snider on Jun 14, 2013, 1:55 pmam Related question...for a naturally ventilated building without "mechanical" cooling: 1) the "mechanical" ventilation requirement of both proposed and baseline models is zero... Last reply: Jean Marais, Jul 11, 2013, 4:22 am |
|
Corporate Policy QuestionEBOM-2009 MRp1: Sustainable Purchasing Policyposted by David Wood on Jun 26, 2013, 1:26 pmLEED EB:OM certification (Canada). However, they have no control over most of their purchases, which pass through a centralized group. And the policy for that group is, bottom line, lowest cost. It does... Last reply: nancy picard, Apr 26, 2016, 3:01 pm |
|
Boiler efficiencyCS-2009 EAp2: Minimum Energy Performanceposted by Mike D on Jul 16, 2013, 6:58 amin or register to post comments Mike D LEEDuser Basic Member 56 thumbs up July 16, 2013- 11:44 am Thanks a lot I will check it out! Log in or register to post comments ... Last reply: Mike D, Jul 16, 2013, 11:44 am |