Waste category as "construction & Demolition waste"

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Adam Insan  on 

One of project located in KSA following construction waste management credit targeting 2 points with 75% diversion as per option 2.

0

Contaminated Soil

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Magdalena Kolodziej Rivas  on 

If a project has a small area of contaminated soil, how should that be incorporated into the Waste Management and Erosion and Sedimentation Plan.  

0

If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Laura Stanley  on 

Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020?

3
Mon Jul 29, 2024, 12:10 pm

CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Olga Yuil  on 

For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C.

0

CDWM - Recycling Facility Diversion Rate

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Preethi Sreeraj  on 

It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast

0

Waste management plan submission with multiple GC's

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Blake Weaver  on 

I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different GC.

1
Wed Apr 17, 2024, 1:00 am
4
Default Avatar
Green business specialist
Skanska
LEEDuser Basic Member
1 thumbs up
Thu Nov 9, 2023, 9:25 pm

CWM Plan for Only Commingled Diversion

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Michelle Rosenberger  on 

My project has decided not to pursue any source separation and will only use commingled waste. They will of course forgo the credit.

4
Sustainability Coordinator
MSDL Architectes
LEEDuser Premium Member
3 thumbs up
Mon Oct 30, 2023, 4:34 pm
3
Architect
Jodoin Lamarre Pratte architectes inc
LEEDuser Premium Member
10 thumbs up
Fri Aug 22, 2025, 8:51 pm
3
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Wed Sep 27, 2023, 11:21 am