Defining Minimum Scope of Work of MBCx to Optimize the Investment Cost for The Building Owner
CS-v4 EAc1:Enhanced commissioningposted by Titinant on
Referring to LEED V4 EAc1 guideline, MBCx is the integration of 3 components: (1) Permanent energy monitoring systems, (2) Real-time energy analysis, (3) Ongoing commissioning.
CxA Role - Limited central plant installed
CS-v4 EAc1:Enhanced commissioningposted by Ciaran McCabe on
Monitoring-based Cx for CS projects
CS-v4 EAc1:Enhanced commissioningposted by Shannon Oletic on
What are the required measurement points for a core and shell project?
CS EA credit Enhanced Cx - who can serve as CxA
CS-v4 EAc1:Enhanced commissioningposted by Deeta Bernstein on
Any precedent in pursuing the Enhanced Cx credits with a CxA who is also the design engineer for P/FP/FA, but is not providing M/E design?
Scope of Envelope Commissioning
CS-v4 EAc1:Enhanced commissioningposted by Michelle Rosenberger on
We have a core and shell warehouse project that has no tenant buildout, i.e., no conditioned space, and therefore no thermal envelope.
Building Envelope Seasonal Testing & General Comment
CS-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Hi! In general, the guidelines for this credit are...very general and vague.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
Different CxA for Construction other than one hired duringDesign
CS-v4 EAc1:Enhanced commissioningposted by mohammad Hassan on
Can a different CxA for a project Construction Phase be hired other than the one hired during Design Phase ?