What are the required measurement points for a core and shell project?

Our project is a small core and shell building designed for retail, with limited M+E equipment (ERVs, RTUs, lighting). RTUs will be installed, but the ductwork will be complete by the tenant. In this case, do the RTUs need to be included as a measurement point for monitoring-based commissioning?