LEED v4.1 Construction Waste CalculatorNC-v4.1 MRc5: Construction and demolition waste managementposted by Mary Lea Tucker on Jun 26, 2020, 7:35 pm
Are the point amounts listed in the summary of the calculator incorrect? They don't seem to match the 4.1 guide. Did I miss an update? Calculator - |
|
v4.1 MRc5 option 2 with MRpc87NC-v4.1 MRc5: Construction and demolition waste managementposted by Kyle Roth on Apr 21, 2021, 11:41 am
Can you use the pilot credit Verified Construction & Demolition Recycling Rates with the v4.1 Construction and Demolition Waste Management credit, option 2? |
|
Commingled recyclingNC-v4.1 MRc5: Construction and demolition waste managementposted by Domenic Smart on Mar 18, 2022, 3:13 pm
Does anyone know of a facility around the Detroit Metropolatin area that does commingled recycling? |
|
LEED documentationNC-v4.1 MRc5: Construction and demolition waste managementposted by SAMWEL MREMA on Aug 20, 2022, 12:39 am
Is it possible to get sample LEED documentation of a real building online. I was particularly interested for New construction, MRc5-construction and demolition waste management. I'm a researcher... |
|
How are waste streams classified? Based on materials type? Weight? Volume?NC-v4.1 MRc5: Construction and demolition waste managementposted by Ayman Raouf on Jul 18, 2022, 1:18 pm
The credit stipulates the below: Divert 50% and 3 material streams for Option 1 Diversion, Path 1. Divert 75% and 4 material streams for Option 1 Diversion, Path 2. ... |
|
Commingled waste and numbers of waste streamsNC-v4.1 MRc5: Construction and demolition waste managementposted by Bryna Dunn on Apr 9, 2020, 4:59 pm
Is there a documented environmental benefit to all the extra red tape we have to wade through "for LEED points" for projects where collecting in a commingled bin is actually the most likely way... Last reply: Tiffany Beffel, May 31, 2020, 2:00 pm |
|
Option 2- Reduction of Total Waste Material for major renovation projectNC-v4.1 MRc5: Construction and demolition waste managementposted by Adam Yarnell on May 6, 2020, 3:51 pm
Hi, What is everyone's take on pursuing Option 2 for a major renovation project? A hopeful approach is to target a 75% diversion for the demo and... Last reply: Tiffany Beffel, May 31, 2020, 2:32 pm |
|
ID# 100002448NC-v4.1 MRc5: Construction and demolition waste managementposted by Esther Leung on Nov 30, 2020, 8:35 am
Under the latest Addenda issued November 9, 2020 (https://www.usgbc.org/leedaddenda/100002448), do you agree that the requirements on ... Last reply: Sarah Buffaloe, May 19, 2021, 9:19 am |
|
ADC- Alternative Daily CoverNC-v4.1 MRc5: Construction and demolition waste managementposted by Catherine Blakemore on Feb 2, 2023, 9:25 am
Does ADC have to be included in the overall waste total for Option 2 or is it just factor into the overall total for Option 1 only? -If Option 2 is selection on the LEED Online form the... Last reply: Dave Hubka, Feb 2, 2023, 9:28 am |
|
"cold in-place recycling" aka "asphalt milling" aka "cold regeneration"NC-v4.1 MRc5: Construction and demolition waste managementposted by Joyce Kelly on Jul 10, 2024, 2:28 pm
This could support this credit and possibly others in the MR and SS categories. Has anyone pursued this within a LEED project? Last reply: Dave Hubka, Jul 10, 2024, 2:52 pm |