Forum discussion

NC-v4.1 MRc5:Construction and Demolition Waste Management

LEED v4.1 Construction Waste Calculator

Are the point amounts listed in the summary of the calculator incorrect? They don't seem to match the 4.1 guide. Did I miss an update?

Calculator -
Option 1 Credit Pathways:
Path 1. Divert 50% and Two Material Streams (1 point)
Path 2. Divert 50% using Certified Commingled Recycling Facility (1 Point)
Path 3. Divert 75% and Three Material Streams (2 points)
Path 4. Divert 75% using Certified Commingled Recycling Facility and One More Material Stream (2 points)
For Option 2 Credit Achievement: fill out this calculator and include additional information necessary to document compliance following instructions on the LEED form. 

BD+C 4.1 Guide -
Option 1. Diversion (1 2 points)
Path 1a.  Divert 50% and Three Material Streams (1 point)
Path 1b.  Divert 50% using Certified Commingled Recycling Facility and One More Material Stream (1 Point) 
Path 2a. Divert 75% and Four Material Streams (2 points) 
Divert at least 75% of the total construction and demolition material; diverted materials must include at least four material streams. 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.