Athena Structural Takeoff

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Monica Verastegui on Aug 4, 2021, 2:59 pm

I am doing LCA analysis for LEED by Athena. the building is modeled in Revit and I am getting the takeoffs from the model. My question is regarding columns and beams calculation. If we do have a...

Tool for LCA

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Martin Maribo on Jan 10, 2022, 10:07 am

Can the Danish tool, LCAbyg, for MR Credit: Building Life-Cycle Impact Reduction be used for a project in Denmark?

LCAbyg is based on EN 15978 and include modules A1, A2, A3, A4, A5, B4,...

Is Option 2 AND Option 3 possible?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Ian McCall on Mar 6, 2023, 2:50 am

Dear LEED Experts, 

In v4.1 is possible to combine "Option 2 AND Option 3" together or is just limited to "Option 1 AND/OR Option 2     OR   ...

Standard EPD to use in LCA

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Jose MARTINEZ on Jun 13, 2023, 4:08 pm

Good afternoon colleagues, we have recently received comments (by LEED reviewers) about the EPDs we use for LCA in the baseline model that are not the standards to consider in the U.S. industry (...

USGBC's commentary "Product Replacement via EPDs optimization"

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by jaclyn lee on Sep 4, 2024, 7:58 pm

We got a comment back from USGBC that said this: 

It is unclear if the Product Replacement via EPDs optimization for aluminum extrusions, hollow structural steel, gypsum boards/...

Lifecycle Assessment Option 2, Path 4 "Salvaged Materials"

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Teeba Alja on Nov 1, 2024, 8:09 am

did anyone targeted Option 2, Path 4 and included recycled steel and rebars as "salvaged/reused"  materials.

Establishing "Baseline Building"

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Kelsey Wotila on Mar 19, 2020, 2:18 pm

Hi All,
My team and I are working through how to determine our baseline building for this credit.  The language reads:
"The baseline and proposed buildings must be of comparable size...

Last reply: Kristian Kicinski, Jun 22, 2022, 5:43 pm

Inclusions in LCA model

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Dalia Abdalla on Aug 30, 2021, 6:48 am

Hello,

While conducting an LCA model under MR Credit: Building Life-cycle Impact Reduction, do we need to consider any considerably sized shading element / decorative...

Last reply: Bipin Karki, Aug 31, 2021, 8:38 am

Option 2, Path 1

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Michelle Halle Stern on Sep 17, 2021, 3:43 pm

Is Athena the only free LCA tool to use to get the 1 point whole building assessment? I was using EC3 Tool, but it isn't accounting for all the environmental impacts outside of Global Warming...

Last reply: Keith Robertson, Mar 8, 2022, 2:09 pm

Does LEED require a third-party to verify the LCA report?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Michael on Aug 18, 2022, 5:52 am

My project is using One Click software to do LCA report. I would like to ask if LEED requires an independent professional (from One Click for example) to verify our LCA report before we submit it...