Forum
Topic | Recent |
---|---|
Metered energy dataEBOM-v4 EAc4: Optimize Energy Performanceposted by LEED Pro Consultant on Jan 14, 2015, 2:48 pm
We are in the process of certifying a LEED... Last reply: Ben Stanley, Mar 8, 2017, 4:04 pm |
|
Group projectEBOM-v4 EAc4: Optimize Energy Performanceposted by Jourdan Younis on Sep 5, 2018, 9:48 am
We have registered 2 buildings as a group project, both buildings are metered and we have the data for both buildings. We generated the energy portfolio for both buildings and there is a huge... Last reply: Trista Brown, Sep 5, 2018, 4:31 pm |
|
Lab Ventillation RequirementEBOM-v4 EAc4: Optimize Energy Performanceposted by Greg DiDomenico on Dec 19, 2018, 8:54 amTrista Brown Project Director WSP USA LEEDuser Basic Member 456 thumbs up February 7, 2019- 8:58 pm Hi Greg, I think your question might be being overlooked because energy modeling isn't typically part of an EBOM project. Should this get re-posted to the BD+C forum so it can get some additional eyes on it? Log in or register to post comments ... Last reply: Trista Brown, Feb 7, 2019, 8:58 pm |
|
Pharmaceutic Industry AplicationEBOM-v4 EAc4: Optimize Energy Performanceposted by Gustavo Fialho Pinto on May 7, 2019, 9:26 am
According to (Capparella, 2013) the average values of pharmaceutical industry energy spending can be estimated at 4391... Last reply: Trista Brown, May 16, 2019, 8:12 pm |
|
Energy meteredEBOM-v4 EAc4: Optimize Energy Performanceposted by FRANCISCO JAVIER JIMENEZ MARQUEZ on Jun 30, 2020, 5:04 am
Hello, We are trying to certify an existing building which have renovated its HVAC facilities recently. Could we obtain points of Optimize Energy Performance doing an energy model... |
|
Option 3 without tenant metersEBOM-v4 EAc4: Optimize Energy Performanceposted by Omar Elrawy on Apr 28, 2022, 11:07 pm
Hi All, We are conducting feasibility study on an existing building in which we are changing chillers. And we are planning to comply under Option 3: Historical Data The building is... |