Verify any ongoing requirements with your regulating agency, as some state and local agencies require a contaminated and remediated site to be retested or monitored on an ongoing basis.
Prior to issuance of the Certificate of Occupancy, ensure that all remediation efforts have been completed, properly documented, and submitted to the proper authorities.
Preserve existing vegetation, especially mature trees, whenever possible. This will decrease costs for temporary stabilization measures and erosion controls. In addition, the vegetation may also be used as part of your landscaping plan.
Corrective actions can range from adjusting the placement of silt fencing and removing debris from stormwater catchment basins to replanting areas of temporary seeding and adding material to gravel skirts at entrances and exits.
The civil engineer, contractor, or a third party should inspect your ESC plan measures on a weekly basis (bi-weekly if inspections are also conducted after any weather event involving more than 0.5 inches of rain), and submit status reports on