Use MERV 8 filtration on any permanent mechanical system equipment used during construction. This adds to construction management tasks and could easily be overlooked and lead to loss of the credit.
Use temporary ventilation systems instead of the permanent HVAC units during construction. This prevents contamination of new ductwork during the construction process.
Keep HVAC&R equipment cut sheets on file in the case that there is an urgent problem with the refrigerant in the equipment so that the refrigerant can be handled or replaced properly.
Calibrate occupancy sensors and other lighting control systems (if included) after the installation of all office equipment and furnishings. Installing office equipment and furnishings after calibrating the lighting control systems could cause poor system performance.