Forgot password?
This feature available to logged-in users only.
Forum access is included with all levels of LEEDuser membership (basic and premium).
Not a member yet? LEEDuser Premium membership gives you access to all credit tips, checklists, documentation samples, and more.
Blog post
Tip sheet
Lighting control systems need to be commissioned at start-up.
Be sure to include the sensor controls within the scope of building commissioning for EAp1 and EAc2.
Demonstrate compliance with LPD requirements using ASHRAE compliance forms. Upload these forms to LEED Online.
Ensure that the correct materials and landscaping are used.
Ensure that the materials and landscaping are used according to your specifications for credit compliance.
Retain manufacturers’ data and design specifications for your fire suppression system, confirming that it meets the credit requirements.
Put in place a program of preventive maintenance for the equipment end-of-life management.
Provide refrigerant leak-detection equipment in the same location as your HVAC&R equipment.
Retain the manufacturer’s cut sheets showing the leakage rate of each piece of equipment.