The civil engineer, contractor, or a third party should inspect your ESC plan measures on a weekly basis (bi-weekly if inspections are also conducted after any weather event involving more than 0.5 inches of rain), and submit status reports on ESC plan implementation. These reports should include labeled and dated photographs, an inspection log, or a narrative report describing the performance of the measures implemented.
Project phase:
Credit tip type: