Install the systems as specified. Have the mechanical engineer and the commissioning agent visit the site to ensure that the correct systems are being installed.
Writing good housekeeping into your plan helps to prevent the growth and spread of mold. Following the IAQ management plan can prevent additional costs due to moisture issues such as replacing materials due to moisture damage.
Conduct periodic inspections for moisture buildup, standing water, and improper storage of absorptive materials. These activities are consistent with implementation of IEQc3.1.
Implement the construction-related components of the IAQ management plan, and ensure that correct procedures are being followed throughout construction.