After completion of all construction activities, document credit compliance in LEED Online by uploading these documents:
- A narrative that declares the standard followed (2003 EPA CGP or local). If you used a local standard, write a narrative report detailing how it is equal to or more stringent than the CPG (Phases I and II, NPDES program).
- A written ESC plan or project drawings showing the control measures used.
- Proof of implementation with one of the following: an inspection report with the required signature, nine photos, or a narrative report.