Variable loads such as dimming controls can be profiled with short-term measurements that determine a load value pegged against another variable point that can be measured or accurately estimated over time. ECMs have to be metered to obtain actual savings. Variable loads like dimming controls can be measured only by metering them first at full power and then at low power. Measure and plot the power use at various dimming points at consistent time intervals.
The M&V plan should define the actions that will be taken by the facility manager to investigate the cause of any discrepancies found and correct any malfunctioning equipment. If goals are not met, or if unexpected performance occurs, the M&V systems will provide useful feedback in tracking the source of problems.
The M&V provider demonstrates through a narrative that the M&V plan will be able to verify actual energy use. For energy systems that are not addressed in the M&V plan you will need to provide a detailed reason for exclusion in the narrative.
The plan establishes who is responsible for managing the process during operations and for taking corrective action. The plan also establishes how long the monitoring will continue.
The owner’s goals and IPMVP guidelines should drive the M&V plan, which should specify which systems are to be sub-metered and which are being spot metered, and how.
Coordinate with the mechanical and electrical engineers to verify that the control devices will be able to provide the information needed for credit compliance.
The industry standard for M&V plans, both in the U.S. and internationally, is the International Performance Measurement and Verification Protocol (IPMVP), owned by the nonprofit Efficiency Valuation Organization.
The M&V provider writes the M&V plan. If possible, involve the facility’s operational staff in writing the plan. The plan should lay out the measurement and response protocol. The M&V plan must define the following:
Baseline energy use
Post-construction energy use
Any adjustments that should be made to the baseline energy use
Full-cutoff luminaires should not cost more than conventional fixtures, but other common strategies for meeting this credit may add costs. These include controls, timers, sensors, and low-power lights like LEDs. Ensure that these features are not eliminated during value-engineering.
If the project is going for multi-party contractor bid, make sure the bid’s package reflects the fixture specifications and performance. Otherwise the contractor may replace the specification with a similar lower-cost fixture that doesn’t have the same wattage or a cover for cutoff.