If the project is going for multi-party contractor bid, make sure the bid’s package reflects the fixture specifications and performance. Otherwise the contractor may replace the specification with a similar lower-cost fixture that doesn’t have

If the project is going for multi-party contractor bid, make sure the bid’s package reflects the fixture specifications and performance. Otherwise the contractor may replace the specification with a similar lower-cost fixture that doesn’t have the same wattage or a cover for cutoff.