The owner’s goals and IPMVP guidelines should drive the M&V plan, which should specify which systems are to be sub-metered and which are being spot metered, and how. The plan also explains how the energy end use is being predicted and measured, and ho

The owner’s goals and IPMVP guidelines should drive the M&V plan, which should specify which systems are to be sub-metered and which are being spot metered, and how. The plan also explains how the energy end use is being predicted and measured, and how the M&V information will be used, such as adjusting building operations to reduce energy use. The plan shall also include a section on corrective action that will take place if the baseline energy use and the post-construction energy use vary greatly. 