Upload documents to LEED Online. This may include a project drawing showing the location of recycling areas if it is not clear on the images that are uploaded as part of the overall LEED submittal. See the Documentation Toolkit for an example.
Write a narrative that describes the recycling storage area, accessibility, frequency of pickup, and volume of the space. You will also need to describe how the area’s dimensions were determined. See the Documentation Toolkit for a sample narrative.
Carefully review manufacturer data. Don’t pay attention to vague claims such as “Our product will give you a regional LEED point” when in truth it will only contribute to the credit. No matter what the manufacturer claims, you’ll still need to ask for manufacturing and extraction locations.
Include submittal requirements within each targeted construction spec section and add general requirements to the Division 1 bid package. Include a copy of any submittal documents that the contractor may need to fill out.
Whenever possible, designate in the construction specifications that contractors use specific product manufacturers that you have verified as producers of locally manufactured and extracted items. This will help save research time for the contractors.
Analyze the initial cost budget to know what materials the project can target and incorporate LEED requirement language accordingly into construction specs for the specific materials. The contractor will appreciate not having to fill out forms for materials that are not local, or that have so little cost value that it is a waste of time.
Incorporating the LEED requirements directly into the drawings as well as into the specs is a good way to remind the contractor and subcontractors of the requirements.
For guidance and sample specification language for incorporating LEED specifications into construction documents, see MasterSpec, or the Whole Building Design Guide. (See Resources.)