Revisit your baseline materials budget as the design evolves to make sure the numbers remain accurate and that you remain on track to achieve your goal for the credit.
Where applicable, the M&V plan should specify submetering sensor locations. Define the specific sensors with their location and sampling rates. In the plan, define the required energy model output and how measured data will be compared to the energy model. Also define how loads are arranged and grouped in electric panels; mixing power, lighting and HVAC equipment loads within individual panels is not recommended.
It is easiest to calibrate the as-built energy simulation software if submetering devices correlate with the breakdown of the energy usage in the energy model.
The projected baseline energy use is calculated by an energy model during the design phase. All ECMs are removed from the model and this energy data becomes the baseline to determine energy savings when compared to the actual energy use. According to Option D of