Designated Smoking Areas in parking garages

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Jason Franken on Jun 2, 2009, 10:36 am

Many project teams that have the option to do so, locate their outdoor smoking area in or near the parking garage to take advantage of the existing cover and distance from main building openings...

LEED Commissioning Guideline Specs

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jim Newman on Aug 10, 2009, 9:37 am

There is a nice set of guideline division 1 specifications on BuildingGreen.com.
http://www.buildinggreen.com/guidespecs/index....

Manufacturer's are slowly

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Bill Swanson on Sep 2, 2009, 8:36 am

Manufacturer's are slowly getting better providing the mercury content of their lamps, but it's still difficult to find for some manufacturers. Don't look in the Material Safety Data Sheet (...

Working through the rational

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Jean Marais on Sep 17, 2009, 4:42 am

Working through the rational method, I've calculated the Time of Concentration (Tc), then itterated using IDF (intensity-duration-frequency) charts until the duration = time of concentration (...

Points available for EQ pr2 (ETS control)?

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by jeff gaines on Sep 24, 2009, 2:49 pm

Are their points available for over achieving on this prerequisite (...

No extra points available for EQp2

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Lauren Sparandara on Sep 25, 2009, 6:14 pm

Hi Jeff,
Sorry, no such luck. What you're looking for is an "exemplary performance" option that would let you earn an innovation point, but those don't exist for prerequisites. You can...

Prescriptive Method Comments

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Carly Ruggieri on Sep 29, 2009, 2:06 pm

If a 'Daylight Zone' does not qualify, the advice in the documentation toolkit on this website suggests reducing the SF of the floor area in the equation until you can determine the area that is...

SSc8 is really 3 credits?

General forums
posted by Jim Newman on Nov 11, 2009, 4:13 pm

Josh Radoff just suggested in his presentation of the...

LEED NC 2.2 campus application guide

General forums
posted by Shannon Gray on Nov 20, 2009, 4:29 pm

The campus application is set up to be a credit-by-credit approach, so a project may use the campus guideline for only one credit or they can use it for all applicable credits. Because of this...

LEED registration and certification fees

General forums
posted by Shannon Gray on Dec 2, 2009, 7:49 pm

This is a huge difference in price! Even projects that are already registered but have not submitted for design or construction review will have to pay the increased prices for certification. So...