Required documentation for WEc3 Option 1 Cooling Tower Cycles of Concentration
NC-v4.1 WEc3:Optimize Process Water Useposted by Mark Benson on
For Option 1 Cooling Tower Cycles of Concentration, in addition to filling out the Potable water analysis table and uploading "a narrative describing the methodology that was used to conduct the po
INpc 137 Safety First: Cleaning your space for emerging pathogens
NC-v4 INc1:Innovationposted by Glen Boldt on
What are some other testing strips that are readily available to test the cleanliness of a surface?
Pilot Credit: Prevention Through Design Comment
Pilot-Credits IPpc93:Prevention through Designposted by Afogreen Build on
To comply with this credit, the project team should fill out the Prevention Through Design worksheet (PtD) for Life Cycle Safety and Health, which is divided into two stages: Operation & Mainte
ASHRAE 90.1 mandatory requirement for daylight dimming not met in many projects
NC-v4 EAp2:Minimum energy performanceposted by TANVEER ANSARI on
Hi,
We have been facing this problem on each and every new project in the region.
Individual workstation controls - Are they really needed?
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
So I need to ask this general question regarding the lighting controls section of this credit.
Natural Gas as process loads
NC-v4 EAp2:Minimum energy performanceposted by A&L SUSTENTABILIDADE on
Dear forum users,
We are modeling a manufacturing building that uses natural gas in its welding processes.
Should the natural gas consumption be included in the energy simulation?
Indoor Overheating risk analysis and mitigation; future weather files
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Tom Phillips on
- Does anybody have good examples of buildings designed to prevent overheating in current and future climates in the US or Canada?
MRpc87 pursuit
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Kristin Rivera on
I've run into many instances where I was less than confident in the validity of recycling data from haulers.
Simplified Approach Option for HVAC Systems (ASHRAE 90.1-2016 Section 6.3) – EA Prerequisite (LEED v4.1 ID+C)
posted by Pongpitch J. on
I would like to confirm whether the Simplified Approach Option for HVAC Systems (ASHRAE 90.1-2016 Section 6.3) is acceptable for demonstrating compliance with EA Prerequisi