Forum quick links
IEQc4.1 Required information
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
IEQc3.1 Required information
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
Extended Producer Program meets Waste Management
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Mike Bahr on
This credit gives the option to use products that are purchased from a manufacturer that participates in an extended producer responsibility program to meet the requirements.
we c1
NC-v4 WEp1:Outdoor water use reductionposted by Maria Peralta on
Hello!
I have an enquiry regarding this credit.
usgbc leed online site very slow and times out
NC-v4 MPR1:Must be in a permanent location on existing landposted by Christopher Cowie on
why is the usgbc leed online site so slow? I can bearly work on line and the site keeps timing out.
Fire Station FTE
posted by Grace Rink on
Hello, the existing threads about calculating FTEs and peak occupants for fire stations do not seem to arrive at the same solution, and I haven't found any specific to v4, so I appreciate any guida
Definition of product distribution, and final manufacturing and documentation
NC-v4.1 MRc2:Environmental Product Declarationsposted by Allison Para on
Working for a architectural building product manufacturer in Sustainable Design Office.
Option 3, Exterior wall repair and repointing
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
For this project, certain brick enclosure sections of exterior wall area are to undergo repair and repoint since they are damaged. Since repair isn't necessarily considered replacement, which
NC-v4 LTc3: High priority site as ACP
NC-2009 SSc3:Brownfield Redevelopmentposted by Heather Appell on
Has anyone tried to pursue LEEDv4 LT High Priority Site as an alternative compliance path for SSc3 Brownfield Redevelopment?