Forum quick links
REACH fulfillment to 1000 ppm / 100 ppm
NC-v4.1 MRc4:Material Ingredientsposted by Alex Parella on
European paints manufacturer only justifies the fulfillment of REACH to 100 ppm, arguing that 1000 ppm level of analysis only suits with gas products.
Paint Storage
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Summer on
Does paint storage room is included in the requirement of interior-cross contamination prevention requirement?
Precertification Before Master Site Registration
posted by Omer Moltay on
Dear All, In a single site there will be two buildings and we wish to implement the Master Site for their LEED certification.
IEQc8.1 Required Information
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Victoria Rios Esteve on
Hi everyone!
IEQc6.1 Required Information
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Victoria Rios Esteve on
Hi everyone!
IEQ6.1 Required information
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
SSp1 Required information
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
MRc5 Required information
NC-2009 MRc5:Regional Materialsposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
MRc4 Required Information
NC-2009 MRc4:Recycled Contentposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
MRc2.2 Requiered information
NC-2009 MRc2:Construction Waste Managementposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreaciate your help.