Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Outdoor CO2 level measurement

Green Commons
posted by  Heather Jauregui  on 

I'm looking to compile an outdoor weather station for a local project, and we'd like to add local outdoor CO2 information to our data.

1
Thu Aug 8, 2019, 5:18 pm

Locally Sourced materials definition

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Elizabeth Kertesz  on 

The reference guide says that products sourced (extracted, manufactured, purchased) within 100 miles of the site are valued at 200% of their cost.

15
Principal
husARchitecture
LEEDuser Premium Member
3 thumbs up
Thu Aug 8, 2019, 4:33 pm

CDP Climate Change Reporting

SC Leaders
posted by  Patty Lloyd  on 

I would be interested to hear which parties in our group have participated in the CDP Program and how you are reporting your efforts.  I have talked to several contractors that just submit the

13
Senior Director, Sustainability
Suffolk Construction
LEEDuser Basic Member
0 thumbs up
Thu Aug 8, 2019, 4:24 pm

MERV 11 in garage unit

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Johanna Koch  on 

Do you have to have MERV 11 filters installed in the ventilation unit that is connected to a garage?

0

Seeking LCA tool expertise

Green Commons
posted by  Paula Melton  on 

I'm writing an article surveying and comparing various embodied carbon tools, including whole-building LCA tools.

0

Green Badger

SC Leaders
posted by  John Mlade  on 

Have any of you relied on Green Badger for LEED documentation on projects?

2
Director of Sustainability
Leopardo Companies, Inc.
LEEDuser Premium Member
12 thumbs up
Wed Aug 7, 2019, 4:14 pm

LEED V4.1 EBO+M Minimum Program Requirements

LEED v4.1 Discussion Forum
posted by  Ben McEwen  on 

I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 do

0

Existing Building Fire Escapes - Building Square-footage

NC-2009 PIf2:Project Summary Details
posted by  Katherine Norris  on 

Our existing building relies on (2) metal fire escapes for emergency egress that we are not modifying.  They are full exterior, self supported, and only connect to the building with later

1
Wed Aug 7, 2019, 5:18 pm